Trade-off analysis for multi-objective aggregate production planning
Aggregate production planning (APP) determines the best way to meet forecast demand in the intermediate future, often from 3 to 18 months ahead, by adjusting regular and overtime production rates, inventory level, labor levels, subcontracting and backorder rates, and other controllable variables. Ho...
Main Authors: | Mortezaei, Navid, Zulkifli, Norzima, Nilashi, Mehrbakhsh |
---|---|
Format: | Article |
Language: | English |
Published: |
UTM Press
2015
|
Online Access: | http://psasir.upm.edu.my/id/eprint/46758/1/Trade-off%20analysis%20for%20multi-objective%20aggregate%20production%20planning.pdf |
Similar Items
-
Multi-objective aggregate production planning model with fuzzy parameters and its solving methods
by: Mortezaei, Navid, et al.
Published: (2013) -
N-job, m-macine lot streaming problem with learning effects
by: Mortezaei, Navid, et al.
Published: (2014) -
Integration of lot sizing and flow shop scheduling with lot streaming
by: Mortezaei, Navid, et al.
Published: (2013) -
Mixed integer formulation for integration of lot sizing and lot streaming problem with scheduled preventive maintenance
by: Mortezaei, Navid, et al.
Published: (2014) -
The Trade-Off between Planning Objectives and Planning Success
by: Laval Valerian
Published: (2016-12-01)