Factors affecting quality during the construction phase in Iraqi government companies

Construction projects play a significant part in the development of any country and quality is one of the important factors in the success of the construction industry. There is a lack of understanding of quality is the problem in the construction industry in Iraq, but the main problem is the absenc...

Full description

Bibliographic Details
Main Authors: M. Ahmed, Husam, Mohd Yusuff, Rosnah
Format: Article
Language:English
Published: Research India Publications 2016
Subjects:
Online Access:http://psasir.upm.edu.my/id/eprint/54271/1/Factors%20affecting%20quality%20during%20the%20construction%20phase%20in%20Iraqi%20government%20companies.pdf
_version_ 1825931005376069632
author M. Ahmed, Husam
Mohd Yusuff, Rosnah
author_facet M. Ahmed, Husam
Mohd Yusuff, Rosnah
author_sort M. Ahmed, Husam
collection UPM
description Construction projects play a significant part in the development of any country and quality is one of the important factors in the success of the construction industry. There is a lack of understanding of quality is the problem in the construction industry in Iraq, but the main problem is the absence of good quality supervision of the construction industry. Based on the literature review yielded managers, designers, and contractors with necessary information needed to better manage the quality of a construction project by identifying the factors that affect process quality of construction projects and to rank them by degree of importance and develop a model to represent the factors affecting the overall quality of Construction projects. This study was based on questionnaire surveys, which was designed based on literature review. After, validation a total 109 questionnaires were collected among project manager, quality engineer, and general manager in Baghdad, the capital city of Iraq. Data were analysed using descriptive statistics and multiple regression analysis applying SPSS software Ver.21. The results of data analysis indicated that the level of importance all factors were more than a moderate level and the highest level which was almost high belonged to the material. The other factors, including Quality systems, Owner, Design, Equipment, Labors and contractor almost ranged between 3.69-3.75. Based on multiple regression analysis among all factors only “contractor” did not show any significant effect on quality in construction projects. The highest effect belonged to, quality systems with (β=0.289, P value<0.001) and then owner and materials followed by design, equipment, site staff and the lowest impact was observed for labor factor (β=0.137, P value=0.049).
first_indexed 2024-03-06T09:20:11Z
format Article
id upm.eprints-54271
institution Universiti Putra Malaysia
language English
last_indexed 2024-03-06T09:20:11Z
publishDate 2016
publisher Research India Publications
record_format dspace
spelling upm.eprints-542712018-03-09T04:56:30Z http://psasir.upm.edu.my/id/eprint/54271/ Factors affecting quality during the construction phase in Iraqi government companies M. Ahmed, Husam Mohd Yusuff, Rosnah Construction projects play a significant part in the development of any country and quality is one of the important factors in the success of the construction industry. There is a lack of understanding of quality is the problem in the construction industry in Iraq, but the main problem is the absence of good quality supervision of the construction industry. Based on the literature review yielded managers, designers, and contractors with necessary information needed to better manage the quality of a construction project by identifying the factors that affect process quality of construction projects and to rank them by degree of importance and develop a model to represent the factors affecting the overall quality of Construction projects. This study was based on questionnaire surveys, which was designed based on literature review. After, validation a total 109 questionnaires were collected among project manager, quality engineer, and general manager in Baghdad, the capital city of Iraq. Data were analysed using descriptive statistics and multiple regression analysis applying SPSS software Ver.21. The results of data analysis indicated that the level of importance all factors were more than a moderate level and the highest level which was almost high belonged to the material. The other factors, including Quality systems, Owner, Design, Equipment, Labors and contractor almost ranged between 3.69-3.75. Based on multiple regression analysis among all factors only “contractor” did not show any significant effect on quality in construction projects. The highest effect belonged to, quality systems with (β=0.289, P value<0.001) and then owner and materials followed by design, equipment, site staff and the lowest impact was observed for labor factor (β=0.137, P value=0.049). Research India Publications 2016 Article PeerReviewed text en http://psasir.upm.edu.my/id/eprint/54271/1/Factors%20affecting%20quality%20during%20the%20construction%20phase%20in%20Iraqi%20government%20companies.pdf M. Ahmed, Husam and Mohd Yusuff, Rosnah (2016) Factors affecting quality during the construction phase in Iraqi government companies. International Journal of Applied Engineering Research, 11 (13). pp. 7974-7981. ISSN 0973-4562; ESSN: 1087-1090 https://www.ripublication.com/Volume/ijaerv11n13.htm Quality performance; Construction projects; Multiply regression analysis
spellingShingle Quality performance; Construction projects; Multiply regression analysis
M. Ahmed, Husam
Mohd Yusuff, Rosnah
Factors affecting quality during the construction phase in Iraqi government companies
title Factors affecting quality during the construction phase in Iraqi government companies
title_full Factors affecting quality during the construction phase in Iraqi government companies
title_fullStr Factors affecting quality during the construction phase in Iraqi government companies
title_full_unstemmed Factors affecting quality during the construction phase in Iraqi government companies
title_short Factors affecting quality during the construction phase in Iraqi government companies
title_sort factors affecting quality during the construction phase in iraqi government companies
topic Quality performance; Construction projects; Multiply regression analysis
url http://psasir.upm.edu.my/id/eprint/54271/1/Factors%20affecting%20quality%20during%20the%20construction%20phase%20in%20Iraqi%20government%20companies.pdf
work_keys_str_mv AT mahmedhusam factorsaffectingqualityduringtheconstructionphaseiniraqigovernmentcompanies
AT mohdyusuffrosnah factorsaffectingqualityduringtheconstructionphaseiniraqigovernmentcompanies