Developing a new method for modifying over - allocated multi - mode resource constraint schedules in the presence of preemptive resources
The issue of resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating is frequently seen after initial scheduling of a project in practice and causes significant amount of efforts to modify the initial schedules. In thi...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2016
|
Online Access: | http://psasir.upm.edu.my/id/eprint/55480/1/Developing%20a%20new%20method%20for%20modifying%20over-allocated%20multi-mode%20resource%20constraint%20schedules%20in%20the%20presence%20of%20preemptive%20resources.pdf |
_version_ | 1825931227308228608 |
---|---|
author | Delgoshaei, Aidin Al-Mudhafar, Ajwad Mohd Ariffin, Mohd. Khairol Anuar |
author_facet | Delgoshaei, Aidin Al-Mudhafar, Ajwad Mohd Ariffin, Mohd. Khairol Anuar |
author_sort | Delgoshaei, Aidin |
collection | UPM |
description | The issue of resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating is frequently seen after initial scheduling of a project in practice and causes significant amount of efforts to modify the initial schedules. In this research, a new method is developed for modifying over-allocated schedules in a multi-mode resource constrained project scheduling problems (MRCPSPs) with positive cash flows (MRCPSP-PCF). The aim is to maximize profit of the MRCPSPs or logically minimizing costs. The proposed method can be used as a macro in Microsoft Office Project® Software to modify resource over-allocated days after scheduling a project. This research considers progress payment method and preemptive resources. The proposed approach maximizes profit by scheduling activities through the resource calendar respecting to the available level of preemptive resources and activity numbers. To examine the performance of the proposed method a number of experiments derived from the literature are solved. The results are then compared with the circumstances where resource constraints are relaxed. The outcomes show that in all studied cases, the proposed algorithm can provide modified schedules with no over-allocated days. Afterward the method is applied to modify a manufacturing project in practice. |
first_indexed | 2024-03-06T09:23:33Z |
format | Article |
id | upm.eprints-55480 |
institution | Universiti Putra Malaysia |
language | English |
last_indexed | 2024-03-06T09:23:33Z |
publishDate | 2016 |
publisher | Growing Science |
record_format | dspace |
spelling | upm.eprints-554802017-09-14T09:49:42Z http://psasir.upm.edu.my/id/eprint/55480/ Developing a new method for modifying over - allocated multi - mode resource constraint schedules in the presence of preemptive resources Delgoshaei, Aidin Al-Mudhafar, Ajwad Mohd Ariffin, Mohd. Khairol Anuar The issue of resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating is frequently seen after initial scheduling of a project in practice and causes significant amount of efforts to modify the initial schedules. In this research, a new method is developed for modifying over-allocated schedules in a multi-mode resource constrained project scheduling problems (MRCPSPs) with positive cash flows (MRCPSP-PCF). The aim is to maximize profit of the MRCPSPs or logically minimizing costs. The proposed method can be used as a macro in Microsoft Office Project® Software to modify resource over-allocated days after scheduling a project. This research considers progress payment method and preemptive resources. The proposed approach maximizes profit by scheduling activities through the resource calendar respecting to the available level of preemptive resources and activity numbers. To examine the performance of the proposed method a number of experiments derived from the literature are solved. The results are then compared with the circumstances where resource constraints are relaxed. The outcomes show that in all studied cases, the proposed algorithm can provide modified schedules with no over-allocated days. Afterward the method is applied to modify a manufacturing project in practice. Growing Science 2016 Article PeerReviewed application/pdf en http://psasir.upm.edu.my/id/eprint/55480/1/Developing%20a%20new%20method%20for%20modifying%20over-allocated%20multi-mode%20resource%20constraint%20schedules%20in%20the%20presence%20of%20preemptive%20resources.pdf Delgoshaei, Aidin and Al-Mudhafar, Ajwad and Mohd Ariffin, Mohd. Khairol Anuar (2016) Developing a new method for modifying over - allocated multi - mode resource constraint schedules in the presence of preemptive resources. Decision Science Letters, 5 (4). pp. 499-518. ISSN 1929-5812 http://www.growingscience.com/dsl/Vol5/dsl_2016_14.pdf 10.5267/j.dsl.2016.5.002 |
spellingShingle | Delgoshaei, Aidin Al-Mudhafar, Ajwad Mohd Ariffin, Mohd. Khairol Anuar Developing a new method for modifying over - allocated multi - mode resource constraint schedules in the presence of preemptive resources |
title | Developing a new method for modifying over - allocated multi - mode resource constraint schedules in the presence of preemptive resources |
title_full | Developing a new method for modifying over - allocated multi - mode resource constraint schedules in the presence of preemptive resources |
title_fullStr | Developing a new method for modifying over - allocated multi - mode resource constraint schedules in the presence of preemptive resources |
title_full_unstemmed | Developing a new method for modifying over - allocated multi - mode resource constraint schedules in the presence of preemptive resources |
title_short | Developing a new method for modifying over - allocated multi - mode resource constraint schedules in the presence of preemptive resources |
title_sort | developing a new method for modifying over allocated multi mode resource constraint schedules in the presence of preemptive resources |
url | http://psasir.upm.edu.my/id/eprint/55480/1/Developing%20a%20new%20method%20for%20modifying%20over-allocated%20multi-mode%20resource%20constraint%20schedules%20in%20the%20presence%20of%20preemptive%20resources.pdf |
work_keys_str_mv | AT delgoshaeiaidin developinganewmethodformodifyingoverallocatedmultimoderesourceconstraintschedulesinthepresenceofpreemptiveresources AT almudhafarajwad developinganewmethodformodifyingoverallocatedmultimoderesourceconstraintschedulesinthepresenceofpreemptiveresources AT mohdariffinmohdkhairolanuar developinganewmethodformodifyingoverallocatedmultimoderesourceconstraintschedulesinthepresenceofpreemptiveresources |