Improving cost and time control in construction using Building Information Model (BIM): a review
The control of cost and time in construction projects is one of the most important issues in construction since the emergence of the construction industry. A successful project should meet not only quality output standards, but also time and budget objectives. The management and control of cost and...
Main Authors: | Muhammad, Muhammad Tahir, Haron, Nuzul Azam, Ales @ Alias, Aidi Hizami, Harun, Aizul Nahar, Muhammad, Isa Bala, Baba, Dorothy Ladi |
---|---|
Format: | Article |
Language: | English |
Published: |
Universiti Putra Malaysia Press
2018
|
Online Access: | http://psasir.upm.edu.my/id/eprint/59591/1/02%20JST-0745-2016-3rdProof.pdf |
Similar Items
-
Strategies to improve cost and time control using building information model (BIM)
by: Muhammad, Muhammad Tahir, et al.
Published: (2016) -
The implementation of Integrated Management Systems (IMS) in construction organizations in Malaysia
by: Ramli, Nor Fazira, et al.
Published: (2023) -
Causes of delay and cost overrun in Malaysian construction industry
by: Muhammad, Muhammad Tahir, et al.
Published: (2017) -
Investigating approaches of integrating BIM, IoT, and facility management for renovating existing buildings: a review
by: Altohami, Abubaker Basheer Abdalwhab, et al.
Published: (2021) -
Implementation of Building Information Modelling (BIM) in Malaysia: a review
by: Haron, Nuzul Azam, et al.
Published: (2017)