Causes of delay and cost overrun in Malaysian construction industry
The construction industry in Malaysia drives the economic growth and development of the country. However, the industry is plagued with delays and cost overrun which transforms what should have been successful projects to projects incurring additional costs, disagreements, litigation and in some case...
Main Authors: | , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Springer Nature Singapore
2017
|
Online Access: | http://psasir.upm.edu.my/id/eprint/64609/1/Causes%20of%20delay%20and%20cost%20overrun%20in%20Malaysian%20construction%20industry.pdf |
_version_ | 1796977931507990528 |
---|---|
author | Muhammad, Muhammad Tahir Haron, Nuzul Azam Ales @ Alias, Aidi Hizami Diugwu, Ikechukwu A. |
author_facet | Muhammad, Muhammad Tahir Haron, Nuzul Azam Ales @ Alias, Aidi Hizami Diugwu, Ikechukwu A. |
author_sort | Muhammad, Muhammad Tahir |
collection | UPM |
description | The construction industry in Malaysia drives the economic growth and development of the country. However, the industry is plagued with delays and cost overrun which transforms what should have been successful projects to projects incurring additional costs, disagreements, litigation and in some cases abandonment of projects. This research studied the causes of delays and cost overrun in the industry and ranked them according to their perceived importance to the contractors, with a view to establishing those to be addressed by the contractors. Online questionnaires were used for data collection for this research. A total of 69 responses were analysed using principal component analysis (PCA) (factor analysis) to identify the main causes. The result of the analysis showed that delay in preparation of design document, poor schedule and control of time, delay in delivery of material to site, lack of knowledge about the different defined execution methods, shortage of labour and material in market, and changes in scope of work were the main causes of delay and cost overrun. The identified causes if properly addressed would reduce the rate of delays and cost overrun in construction projects, thus enhancing the economic growth and development of the country. |
first_indexed | 2024-03-06T09:47:17Z |
format | Conference or Workshop Item |
id | upm.eprints-64609 |
institution | Universiti Putra Malaysia |
language | English |
last_indexed | 2024-03-06T09:47:17Z |
publishDate | 2017 |
publisher | Springer Nature Singapore |
record_format | dspace |
spelling | upm.eprints-646092019-12-02T07:11:39Z http://psasir.upm.edu.my/id/eprint/64609/ Causes of delay and cost overrun in Malaysian construction industry Muhammad, Muhammad Tahir Haron, Nuzul Azam Ales @ Alias, Aidi Hizami Diugwu, Ikechukwu A. The construction industry in Malaysia drives the economic growth and development of the country. However, the industry is plagued with delays and cost overrun which transforms what should have been successful projects to projects incurring additional costs, disagreements, litigation and in some cases abandonment of projects. This research studied the causes of delays and cost overrun in the industry and ranked them according to their perceived importance to the contractors, with a view to establishing those to be addressed by the contractors. Online questionnaires were used for data collection for this research. A total of 69 responses were analysed using principal component analysis (PCA) (factor analysis) to identify the main causes. The result of the analysis showed that delay in preparation of design document, poor schedule and control of time, delay in delivery of material to site, lack of knowledge about the different defined execution methods, shortage of labour and material in market, and changes in scope of work were the main causes of delay and cost overrun. The identified causes if properly addressed would reduce the rate of delays and cost overrun in construction projects, thus enhancing the economic growth and development of the country. Springer Nature Singapore 2017 Conference or Workshop Item PeerReviewed text en http://psasir.upm.edu.my/id/eprint/64609/1/Causes%20of%20delay%20and%20cost%20overrun%20in%20Malaysian%20construction%20industry.pdf Muhammad, Muhammad Tahir and Haron, Nuzul Azam and Ales @ Alias, Aidi Hizami and Diugwu, Ikechukwu A. (2017) Causes of delay and cost overrun in Malaysian construction industry. In: Global Civil Engineering Conference (GCEC 2017), 25-28 July 2017, Kuala Lumpur, Malaysia. (pp. 47-57). https://link.springer.com/chapter/10.1007/978-981-10-8016-6_5 10.1007/978-981-10-8016-6_5 |
spellingShingle | Muhammad, Muhammad Tahir Haron, Nuzul Azam Ales @ Alias, Aidi Hizami Diugwu, Ikechukwu A. Causes of delay and cost overrun in Malaysian construction industry |
title | Causes of delay and cost overrun in Malaysian construction industry |
title_full | Causes of delay and cost overrun in Malaysian construction industry |
title_fullStr | Causes of delay and cost overrun in Malaysian construction industry |
title_full_unstemmed | Causes of delay and cost overrun in Malaysian construction industry |
title_short | Causes of delay and cost overrun in Malaysian construction industry |
title_sort | causes of delay and cost overrun in malaysian construction industry |
url | http://psasir.upm.edu.my/id/eprint/64609/1/Causes%20of%20delay%20and%20cost%20overrun%20in%20Malaysian%20construction%20industry.pdf |
work_keys_str_mv | AT muhammadmuhammadtahir causesofdelayandcostoverruninmalaysianconstructionindustry AT haronnuzulazam causesofdelayandcostoverruninmalaysianconstructionindustry AT alesaliasaidihizami causesofdelayandcostoverruninmalaysianconstructionindustry AT diugwuikechukwua causesofdelayandcostoverruninmalaysianconstructionindustry |