Causes of delay and cost overrun in Malaysian construction industry
The construction industry in Malaysia drives the economic growth and development of the country. However, the industry is plagued with delays and cost overrun which transforms what should have been successful projects to projects incurring additional costs, disagreements, litigation and in some case...
Main Authors: | Muhammad, Muhammad Tahir, Haron, Nuzul Azam, Ales @ Alias, Aidi Hizami, Diugwu, Ikechukwu A. |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Springer Nature Singapore
2017
|
Online Access: | http://psasir.upm.edu.my/id/eprint/64609/1/Causes%20of%20delay%20and%20cost%20overrun%20in%20Malaysian%20construction%20industry.pdf |
Similar Items
-
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013) -
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018) -
Modeling the factors causing cost overrun in UAE construction industry
by: Ahmed Marey Alhammadi, Ahmed Salem
Published: (2022) -
Strategies to improve cost and time control using building information model (BIM)
by: Muhammad, Muhammad Tahir, et al.
Published: (2016) -
Predicament in construction – an overlook to delays, cost overruns and risks
by: Ahmad Aiman Ariff, Ahmad Zamri
Published: (2019)