Cost-benefit analysis on the development of Belum-Temenggor Ecological Corridor in Gerik, Perak
The Central Forest Spine (CFS) project has the mission to protect the nation's biodiversity by connecting CFS complex key to making it a vast area of forests stretching from north to south and East to the West of Peninsular Malaysia which involves the creation of 37 ecological corridors in Peni...
Main Authors: | Ibrahim, Zahari, Tuan Ibrahim, Tuan Marina, Othman, Mohd Shahwahid |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Sabah Forestry Department
2014
|
Online Access: | http://psasir.upm.edu.my/id/eprint/66884/1/MFC-17-1.pdf |
Similar Items
-
Potentials and challenges of involving indigenous communities in ecotourism in Belum-Temenggor Forest Complex, Perak, Malaysia
by: Abdullah, Azreen Rozainee, et al.
Published: (2013) -
Identification of potential species to be planted in poor forests of the central forest spine (CFS) wildlife corridor Gerik, Perak
by: A. H., Muhammad Said, et al.
Published: (2014) -
Local economic development – assessment of local attitudes
towards conservation and tourism around Royal Belum-Temenggor Forest Complex, Perak, Malaysia
by: Kamarudin, Khairul Hisyam, et al.
Published: (2015) -
Diversity And Distribution Of Trichoptera (INSECTA) Larvae In Selected Rivers Of Royal Belum State Park, Gerik, Perak With References To Habitat Preference And Diel Periodicity
by: Rusli, Siti Mariam Zhafarina
Published: (2011) -
PENYELIDIK USM TERIMA GERAN YAYASAN EMKAY KAJI
KESEDARAN ORANG ASLI BELUM-TEMENGGOR
TERHADAP TIBI
by: MPRC, Pusat Media & Perhubungan Awam
Published: (2017)