Reliability-based phasor measurement unit with outage of transmission lines

This paper discussed on the Monte-Carlo simulation technique to determine the optimal placement of Phasor Measurement Unit (PMU) in power system whilst ensuring the observability of the system. In addition, the information on Force Outage Rate (FOR) of the system can be calculated using Markov Chain...

Full description

Bibliographic Details
Main Authors: Othman, Muhammad Murtadha, Musirin, Ismail, Mohd Rosli, Ain Munirah, Othman, Mohammad Lutfi
Format: Article
Language:English
Published: Science Publishing Corporation 2018
Online Access:http://psasir.upm.edu.my/id/eprint/73763/1/Reliability-based%20phasor%20measurement%20unit%20with%20outage%20of%20transmission%20lines.pdf