A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers
Main Author: | Sambasivan, Murali |
---|---|
Format: | Article |
Published: |
2008
|
Similar Items
-
A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers
by: Sambasivan, Murali, et al.
Published: (2005) -
A heuristic procedure for solving multi-plant, multi-item, multi-period capacitated lot-sizing problems
by: Sambasivan, Murali, et al.
Published: (2002) -
The capacitated lot size problems
by: Matsuo, Hirofumi.
Published: (2024) -
A comparison of exact and heuristic routines for lot size determination in multi-stage assembly systems
by: Crowston, Wallace B. S., et al.
Published: (2009) -
Capacitated multi-stage production system with joint processing of items /
by: 229959 Viswanathan, S.
Published: (1993)