Risk management challenges in Malaysia’s landscape architecture project

This study aims to review current risk management challenges in Malaysia landscape architecture projects. This subject found to be lacking and yet essential to strategies for effective application. The data collection conducted through a semi-structured interview with twenty-four landscape architect...

Full description

Bibliographic Details
Main Authors: S.Muthuveeran, Adam Aruldewan, Mohd Tahir, Osman, Ibrahim, Roziya, Mohd Noor, Mohd Zairul
Format: Article
Language:English
Published: e-International Publishing House 2020
Online Access:http://psasir.upm.edu.my/id/eprint/87494/1/87494.pdf
_version_ 1824452235292049408
author S.Muthuveeran, Adam Aruldewan
Mohd Tahir, Osman
Ibrahim, Roziya
Mohd Noor, Mohd Zairul
author_facet S.Muthuveeran, Adam Aruldewan
Mohd Tahir, Osman
Ibrahim, Roziya
Mohd Noor, Mohd Zairul
author_sort S.Muthuveeran, Adam Aruldewan
collection UPM
description This study aims to review current risk management challenges in Malaysia landscape architecture projects. This subject found to be lacking and yet essential to strategies for effective application. The data collection conducted through a semi-structured interview with twenty-four landscape architect professional based in the Klang Valley region. Then analysed using content and thematic analysis method. The research found that multiple challenges factor permits effective risk management application in the project. The study suggests for an extensive strategy to risk management application into the project to be formulated in enabling effective management of risk to improve project performances.
first_indexed 2025-02-19T02:47:18Z
format Article
id upm.eprints-87494
institution Universiti Putra Malaysia
language English
last_indexed 2025-02-19T02:47:18Z
publishDate 2020
publisher e-International Publishing House
record_format dspace
spelling upm.eprints-874942025-02-12T04:29:12Z http://psasir.upm.edu.my/id/eprint/87494/ Risk management challenges in Malaysia’s landscape architecture project S.Muthuveeran, Adam Aruldewan Mohd Tahir, Osman Ibrahim, Roziya Mohd Noor, Mohd Zairul This study aims to review current risk management challenges in Malaysia landscape architecture projects. This subject found to be lacking and yet essential to strategies for effective application. The data collection conducted through a semi-structured interview with twenty-four landscape architect professional based in the Klang Valley region. Then analysed using content and thematic analysis method. The research found that multiple challenges factor permits effective risk management application in the project. The study suggests for an extensive strategy to risk management application into the project to be formulated in enabling effective management of risk to improve project performances. e-International Publishing House 2020-06 Article PeerReviewed text en cc_by_nc_nd_4 http://psasir.upm.edu.my/id/eprint/87494/1/87494.pdf S.Muthuveeran, Adam Aruldewan and Mohd Tahir, Osman and Ibrahim, Roziya and Mohd Noor, Mohd Zairul (2020) Risk management challenges in Malaysia’s landscape architecture project. Environment-behaviour Proceedings Journal, 5 (14). pp. 179-186. ISSN 2398-4287 https://ebpj.e-iph.co.uk/index.php/EBProceedings/article/view/2162 10.21834/ebpj.v5i14.2162
spellingShingle S.Muthuveeran, Adam Aruldewan
Mohd Tahir, Osman
Ibrahim, Roziya
Mohd Noor, Mohd Zairul
Risk management challenges in Malaysia’s landscape architecture project
title Risk management challenges in Malaysia’s landscape architecture project
title_full Risk management challenges in Malaysia’s landscape architecture project
title_fullStr Risk management challenges in Malaysia’s landscape architecture project
title_full_unstemmed Risk management challenges in Malaysia’s landscape architecture project
title_short Risk management challenges in Malaysia’s landscape architecture project
title_sort risk management challenges in malaysia s landscape architecture project
url http://psasir.upm.edu.my/id/eprint/87494/1/87494.pdf
work_keys_str_mv AT smuthuveeranadamaruldewan riskmanagementchallengesinmalaysiaslandscapearchitectureproject
AT mohdtahirosman riskmanagementchallengesinmalaysiaslandscapearchitectureproject
AT ibrahimroziya riskmanagementchallengesinmalaysiaslandscapearchitectureproject
AT mohdnoormohdzairul riskmanagementchallengesinmalaysiaslandscapearchitectureproject