The integrated prediction system for geological conditions ahead of tunnel faces
It is essential to employ the observational design and construction method to manage tunnel projects efficiently.
Main Authors: | , , , |
---|---|
格式: | Conference or Workshop Item |
语言: | English |
出版: |
2011
|
主题: | |
在线阅读: | http://eprints.usm.my/25128/1/FP-CH315.pdf |