The integrated prediction system for geological conditions ahead of tunnel faces

It is essential to employ the observational design and construction method to manage tunnel projects efficiently.

书目详细资料
Main Authors: S. Shirasagi, S. Shirasagi, T. Yamamoto, T. Yamamoto, Y. Mito, Y. Mito, M. Ashraf, M. Ashraf
格式: Conference or Workshop Item
语言:English
出版: 2011
主题:
在线阅读:http://eprints.usm.my/25128/1/FP-CH315.pdf