Comparison Of Parallel Kanban-Base Stock System To Control Multi-Product Multi-Stage Production With Rework Through Simulation

A recent globalization challenge compels manufacturing industries to offer a large variety of products with varied demands to suit their customers’ needs. However, these complex scenarios have led to high work-in-process (WIP) and defects, thus inspires many researches to investigate the optimum wa...

Szczegółowa specyfikacja

Opis bibliograficzny
1. autor: Mustafa, Shaliza Azreen
Format: Praca dyplomowa
Język:English
Wydane: 2016
Hasła przedmiotowe:
Dostęp online:http://eprints.usm.my/41278/1/SHALIZA_AZREEN_BINTI_MUSTAFA_24_Pages.pdf