Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India
This paper aims at studying the factors that contribute to time delay and cost overrun of Road over Bridge (ROB) projects in India. Data for the research study were collected from 62 respondents, including owners, contractors, and consultants of ROB projects. The literature survey and the questio...
Main Authors: | Venkateswaran, Chandrasekaran Balaji, Murugasan, Rajiah |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit Universiti Sains Malaysia
2017
|
Subjects: | |
Online Access: | http://eprints.usm.my/41426/1/jcdc2017.22.s1.5.pdf |
Similar Items
-
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016) -
Investigation Into The Causes Of Delays And Cost Overruns In
Uganda's Public Sector Construction Projects
by: Alinaitwe, Henry, et al.
Published: (2013) -
A Critical Review of Factors Affecting Manpower and Equipment
Productivity in Tall Building Construction Projects
by: Parthasarathy, Mudumbai Krishnaswamy, et al.
Published: (2017) -
Significant Factors Causing Cost Overruns In
Telecommunication Projects In Nigeria
by: Ameh, Oko John, et al.
Published: (2010) -
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)