Developing A Preventive Cost Control Model By Utilising Early Warnings And Risks
The study of project control (cost control in particular) has only received limited attention in the Malaysian construction industry. The conventional project control system is basically corrective based, where project problems may have already occurred and the company may have experienced losses. A...
Main Author: | Bahaudin, Ahmad Yusni |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://eprints.usm.my/43194/1/AHMAD%20YUSNI%20BIN%20BAHAUDIN.pdf |
Similar Items
-
Perceptions of the quality of life among low and medium-cost
housing community in Penang Island, Malaysia
by: Badarulzaman, Nurwati, et al.
Published: (2008) -
The Utilisation Of Wood Ash As Alkaline Activator For Ambient Cured Geopolymer Concrete
by: Samsudin, Muhammad Hasnolhadi
Published: (2020) -
The Utilisation Of Wood Ash As Alkaline Activator For Ambient Cured Geopolymer Concrete
by: Samsudin, Muhammad Hasnolhadi
Published: (2020) -
A Path toward Safer Heritage Buildings through Excellent Fire Prevention and Control System in Malaysia
by: Othuman Mydin, Md Azree, et al.
Published: (2014) -
Studying the Reasons for Delay and Cost Overrun in Construction
Projects: The Case of Iran
by: Samarghandi, Hamed, et al.
Published: (2016)