Improving The Performance Of An Equipment Engineering Group In A Wafer Foundry
The study focuses on a single department in a wafer foundry business where the product goes through multiple passes through each department before completing the manufacturing cycle. The study plan is to uncover how the equipment uptime performance can be improved to help the company achieve the req...
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://eprints.usm.my/44474/1/PALANIAPPA%20SUBRAMANIAM.pdf |
_version_ | 1825834973786013696 |
---|---|
author | Subramaniam, Palaniappa |
author_facet | Subramaniam, Palaniappa |
author_sort | Subramaniam, Palaniappa |
collection | USM |
description | The study focuses on a single department in a wafer foundry business where the product goes through multiple passes through each department before completing the manufacturing cycle. The study plan is to uncover how the equipment uptime performance can be improved to help the company achieve the required production numbers.The analysis uses the Fishbone and why-why analysis to uncover the true root cause of the poor tool uptime performance, the benchmarking tool for comparing human capital numbers with a neighbouring wafer production facility and consolidates the findings using Input-Process-Outpout (IPO) model for a complete picture of the problem. |
first_indexed | 2024-03-06T15:30:44Z |
format | Thesis |
id | usm.eprints-44474 |
institution | Universiti Sains Malaysia |
language | English |
last_indexed | 2024-03-06T15:30:44Z |
publishDate | 2014 |
record_format | dspace |
spelling | usm.eprints-444742019-05-31T01:12:35Z http://eprints.usm.my/44474/ Improving The Performance Of An Equipment Engineering Group In A Wafer Foundry Subramaniam, Palaniappa HF5001-6182 Business The study focuses on a single department in a wafer foundry business where the product goes through multiple passes through each department before completing the manufacturing cycle. The study plan is to uncover how the equipment uptime performance can be improved to help the company achieve the required production numbers.The analysis uses the Fishbone and why-why analysis to uncover the true root cause of the poor tool uptime performance, the benchmarking tool for comparing human capital numbers with a neighbouring wafer production facility and consolidates the findings using Input-Process-Outpout (IPO) model for a complete picture of the problem. 2014 Thesis NonPeerReviewed application/pdf en http://eprints.usm.my/44474/1/PALANIAPPA%20SUBRAMANIAM.pdf Subramaniam, Palaniappa (2014) Improving The Performance Of An Equipment Engineering Group In A Wafer Foundry. Masters thesis, Universiti Sains Malaysia. |
spellingShingle | HF5001-6182 Business Subramaniam, Palaniappa Improving The Performance Of An Equipment Engineering Group In A Wafer Foundry |
title | Improving The Performance Of An Equipment Engineering Group In A Wafer Foundry |
title_full | Improving The Performance Of An Equipment Engineering Group In A Wafer Foundry |
title_fullStr | Improving The Performance Of An Equipment Engineering Group In A Wafer Foundry |
title_full_unstemmed | Improving The Performance Of An Equipment Engineering Group In A Wafer Foundry |
title_short | Improving The Performance Of An Equipment Engineering Group In A Wafer Foundry |
title_sort | improving the performance of an equipment engineering group in a wafer foundry |
topic | HF5001-6182 Business |
url | http://eprints.usm.my/44474/1/PALANIAPPA%20SUBRAMANIAM.pdf |
work_keys_str_mv | AT subramaniampalaniappa improvingtheperformanceofanequipmentengineeringgroupinawaferfoundry |