Hidden Cost In Building Conservation Works

More often than not, building conservation projects are usually completed with high cost and high time variances, which, in part is due to the uncertainty in actual work needed to conserve the building. Also, difficulty exists for cost estimators who are unfamiliar with building conservation work...

Full description

Bibliographic Details
Main Author: Wee, Li Woon
Format: Thesis
Language:English
Published: 2011
Subjects:
Online Access:http://eprints.usm.my/45706/1/WEE%20LI%20WOON_HJ.pdf
_version_ 1825835203568861184
author Wee, Li Woon
author_facet Wee, Li Woon
author_sort Wee, Li Woon
collection USM
description More often than not, building conservation projects are usually completed with high cost and high time variances, which, in part is due to the uncertainty in actual work needed to conserve the building. Also, difficulty exists for cost estimators who are unfamiliar with building conservation works to estimate accurately. Realising the predicament in producing an accurate estimate, a study was conducted to identify the hidden costs of building conservation works, specifically the work items that contribute to such hidden cost and the factors affecting the cost overruns. A total of 16 respondents who have been involved in building conservation projects in Malaysia are surveyed using postal questionnaire. A total of thirty (30) work items that are specific to building conservation works are identified from the survey. Based on the results, these 30 special work items are grouped into four main categories, namely Research and Documentation, Scientific Studies, Laboratory Tests and Temporary Works. From the survey, work items such as ‘Carbonation Test’, ‘NIPGAT Test’, ‘Petrography Test’, and ‘Covermeter Survey’ are found to have the highest Relative Index value. Additionally, a total of 32 factors are also surveyed to detect the determinants of hidden costs in building conservation works. Dominant variables which are causing hidden costs include ‘lack of estimator’s expertise in conservation work’ and ‘lack of communication between consultants’. This study concludes with a list of work items encountered in building conservation works for quantity surveyor’s reference to prepare the cost estimate in future.
first_indexed 2024-03-06T15:34:13Z
format Thesis
id usm.eprints-45706
institution Universiti Sains Malaysia
language English
last_indexed 2024-03-06T15:34:13Z
publishDate 2011
record_format dspace
spelling usm.eprints-457062019-10-23T07:37:46Z http://eprints.usm.my/45706/ Hidden Cost In Building Conservation Works Wee, Li Woon TH Building construction More often than not, building conservation projects are usually completed with high cost and high time variances, which, in part is due to the uncertainty in actual work needed to conserve the building. Also, difficulty exists for cost estimators who are unfamiliar with building conservation works to estimate accurately. Realising the predicament in producing an accurate estimate, a study was conducted to identify the hidden costs of building conservation works, specifically the work items that contribute to such hidden cost and the factors affecting the cost overruns. A total of 16 respondents who have been involved in building conservation projects in Malaysia are surveyed using postal questionnaire. A total of thirty (30) work items that are specific to building conservation works are identified from the survey. Based on the results, these 30 special work items are grouped into four main categories, namely Research and Documentation, Scientific Studies, Laboratory Tests and Temporary Works. From the survey, work items such as ‘Carbonation Test’, ‘NIPGAT Test’, ‘Petrography Test’, and ‘Covermeter Survey’ are found to have the highest Relative Index value. Additionally, a total of 32 factors are also surveyed to detect the determinants of hidden costs in building conservation works. Dominant variables which are causing hidden costs include ‘lack of estimator’s expertise in conservation work’ and ‘lack of communication between consultants’. This study concludes with a list of work items encountered in building conservation works for quantity surveyor’s reference to prepare the cost estimate in future. 2011-11 Thesis NonPeerReviewed application/pdf en http://eprints.usm.my/45706/1/WEE%20LI%20WOON_HJ.pdf Wee, Li Woon (2011) Hidden Cost In Building Conservation Works. Masters thesis, Universiti Sains Malaysia.
spellingShingle TH Building construction
Wee, Li Woon
Hidden Cost In Building Conservation Works
title Hidden Cost In Building Conservation Works
title_full Hidden Cost In Building Conservation Works
title_fullStr Hidden Cost In Building Conservation Works
title_full_unstemmed Hidden Cost In Building Conservation Works
title_short Hidden Cost In Building Conservation Works
title_sort hidden cost in building conservation works
topic TH Building construction
url http://eprints.usm.my/45706/1/WEE%20LI%20WOON_HJ.pdf
work_keys_str_mv AT weeliwoon hiddencostinbuildingconservationworks