Reduce Manufacturing Lead Time Through PDCA And Waste Elimination In Metal Casting Company: A Case Study
In the late 1900s and early 2000s, there were a few newly founded foundries that were better organized and used contemporary machinery to make high-quality iron and steel castings in small and medium-sized enterprises (SMEs). The late delivery of a particular product was one of the most important...
Main Author: | Azhan, Anis Masturina |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Sains Malaysia
2022
|
Subjects: | |
Online Access: | http://eprints.usm.my/55457/1/Reduce%20Manufacturing%20Lead%20Time%20Through%20Pdca%20And%20Waste%20Elimination%20In%20Metal%20Casting%20Company%20A%20Case%20Study_Anis%20Masturina%20Azhan.pdf |
Similar Items
-
Developing Android Application To Guide Lean Six Sigma PDCA Project
by: Ong, Sin Joo
Published: (2018) -
Lean Manufacturing Implementation in Reducing Waste for Electronic Assembly Line
by: Nurul Husna, Zakaria, et al.
Published: (2017) -
Perception on prolonged standing work in electronic manufacturing company
by: Mohamad, Norlizaa, et al.
Published: (2018) -
The Production Of Cast Metal Matrix Composite By A Modified Stir Casting Method
by: Hashim, Jasmi
Published: (2001) -
Agility assessment in manufacturing companies
by: Galankashi, M. R., et al.
Published: (2019)