Summary: | Water quality is one of the main element that is studied thoroughly in an
Environmental Impact Assessment. The main scope of this case study is to determine
the EIA on water quality during and after completing the construction works Sungai
Kinta Dam Project, Mukim Hulu Kinta, Kinta District, Perak from 1991 until 2005.
The analysis are done based on the data that were obtained from the Project Manager;
Metropolitan Utilities Corporation Sdn. Bhd. The most critical issue is the turbidity
because it can reflects the physical impacts to the other water quality parameters such
as colour, nitrate, hardness, total suspended solids and etc. The main sources that
contribute to the decreasing of water quality are the construction activities of dam and
the construction of the Highway across the upper catchment areas. The water quality of
Sungai Kinta that was affected will recover after both activities are completed to
ensure safe and clean water can be supplied to population in Ipoh and the outlying
areas. In conclusion, the water quality on the construction of the Sg. Kinta Dam
Project, Perak is consistent with the evaluation of EIA that had been prepared before
the project started.
|