Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects

Disputes have kept Building Information Modelling (BIM) from reaching its full potential. Consequently, this study attempts to reduce BIM implementation disputes in Malaysian public construction projects. Experts were involved in two phases of the mixed methods study. Phase 1 was a preliminary inter...

Full description

Bibliographic Details
Main Author: Ahmad, Nur Hidayah
Format: Thesis
Language:English
Published: 2022
Subjects:
Online Access:http://eprints.usm.my/59274/1/24%20Pages%20from%20NUR%20HIDAYAH%20BINTI%20AHMAD%20-%20TESIS.pdf
_version_ 1797014240730546176
author Ahmad, Nur Hidayah
author_facet Ahmad, Nur Hidayah
author_sort Ahmad, Nur Hidayah
collection USM
description Disputes have kept Building Information Modelling (BIM) from reaching its full potential. Consequently, this study attempts to reduce BIM implementation disputes in Malaysian public construction projects. Experts were involved in two phases of the mixed methods study. Phase 1 was a preliminary interview with six experts (to determine the need for reducing disputes among supply chain actors for BIM implementation). Meanwhile, Phase 2 began with a quantitative approach using the Fuzzy Delphi Method (FDM) on 14 experts to determine the main contributors that influence disputes (Objective Number 1). This was followed by qualitative approaches, namely self-grouping to identify the pathogens and pathogen sub-categories of disputes (Objective Number 2) and two sessions of Focus Group Discussion (FGD) involving six experts towards finally developing a validated SCM framework for BIM implementation (Objective Number 3). As a result of the quantitative approach, three main contributors that influence disputes were determined. The qualitative approach identified: (i) two pathogens as people issues, (ii) only one pathogen and two sub-pathogens as process problems, and (iii) product uncertainty is limited to one pathogen and one pathogen sub-category.
first_indexed 2024-03-06T16:13:18Z
format Thesis
id usm.eprints-59274
institution Universiti Sains Malaysia
language English
last_indexed 2024-03-06T16:13:18Z
publishDate 2022
record_format dspace
spelling usm.eprints-592742023-08-28T01:55:11Z http://eprints.usm.my/59274/ Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects Ahmad, Nur Hidayah TH1-9745 Building construction Disputes have kept Building Information Modelling (BIM) from reaching its full potential. Consequently, this study attempts to reduce BIM implementation disputes in Malaysian public construction projects. Experts were involved in two phases of the mixed methods study. Phase 1 was a preliminary interview with six experts (to determine the need for reducing disputes among supply chain actors for BIM implementation). Meanwhile, Phase 2 began with a quantitative approach using the Fuzzy Delphi Method (FDM) on 14 experts to determine the main contributors that influence disputes (Objective Number 1). This was followed by qualitative approaches, namely self-grouping to identify the pathogens and pathogen sub-categories of disputes (Objective Number 2) and two sessions of Focus Group Discussion (FGD) involving six experts towards finally developing a validated SCM framework for BIM implementation (Objective Number 3). As a result of the quantitative approach, three main contributors that influence disputes were determined. The qualitative approach identified: (i) two pathogens as people issues, (ii) only one pathogen and two sub-pathogens as process problems, and (iii) product uncertainty is limited to one pathogen and one pathogen sub-category. 2022-03 Thesis NonPeerReviewed application/pdf en http://eprints.usm.my/59274/1/24%20Pages%20from%20NUR%20HIDAYAH%20BINTI%20AHMAD%20-%20TESIS.pdf Ahmad, Nur Hidayah (2022) Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects. PhD thesis, Perpustakaan Hamzah Sendut.
spellingShingle TH1-9745 Building construction
Ahmad, Nur Hidayah
Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
title Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
title_full Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
title_fullStr Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
title_full_unstemmed Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
title_short Development Of Supply Chain Management Framework For Building Information Modelling Implementation In Public Sector Construction Projects
title_sort development of supply chain management framework for building information modelling implementation in public sector construction projects
topic TH1-9745 Building construction
url http://eprints.usm.my/59274/1/24%20Pages%20from%20NUR%20HIDAYAH%20BINTI%20AHMAD%20-%20TESIS.pdf
work_keys_str_mv AT ahmadnurhidayah developmentofsupplychainmanagementframeworkforbuildinginformationmodellingimplementationinpublicsectorconstructionprojects