Critical success factor model framework for lean management application in industrialised building system (IBS) production
In Malaysia, Industrialised Building System (IBS) has been recognised as a potential solution in improving the deliverables of construction projects. However, the acceptance of this modern technology is still low. Most of the construction players prefer the conventional construction method whi...
Main Author: | Mohd Noor, Siti Rahimah |
---|---|
Format: | Thesis |
Language: | English English English |
Published: |
2020
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/1155/2/24p%20SITI%20RAHIMAH%20MOHD%20NOOR.pdf http://eprints.uthm.edu.my/1155/1/SITI%20RAHIMAH%20MOHD%20NOOR%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/1155/3/SITI%20RAHIMAH%20MOHD%20NOOR%20WATERMARK.pdf |
Similar Items
-
Insights into the adoption of lean management in industrialised building system (IBS) implementation: the drivers and challenges
by: Mohd Noor, Siti Rahimah, et al.
Published: (2018) -
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
by: Ali Al-Shami, Mohammed Hamid
Published: (2019) -
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009) -
Legislative challenge to sustainable application of industrialized building system (IBS)
by: Yunus, Riduan, et al.
Published: (2016) -
The effect of different industrialized building system (IBS) construction methods compared to the conventional method on occupational safety and health (OSH) industry risks in construction
by: Mohd Amin, Mohamad Ariff
Published: (2021)