Mitigation measures for delay in dam’s project - A case study in Pakistan
Construction sector is known as main sector which contributes major role in term of employment as compared to other sectors in developing countries as well as developed countries. But unfortunately, this sector is still facing many challenges which including construction delay, construction cost o...
Main Authors: | Sohoo, Shujauddin, Syed Mohamad, Syed Burhanuddin Hilmi, Yunus, Riduan, Ahmed Memon, Mansoor |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2024
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/11737/1/P16947_8bb45bc219ae877606f377068cb8193a%203.pdf |
Similar Items
-
Conductive bridge random access memory
by: Aw, Xin Zhong
Published: (2024) -
Foundation design of single-span arch bridges in China
by: Zhang, Zhitong, et al.
Published: (2023) -
Holyoke Dam
by: Huntington, W. F.
Published: (2024) -
Modeling of formation and breaking of lubricant bridge in the head–disk interface by molecular dynamic simulation
by: Dai, Xiangyu, et al.
Published: (2020) -
A detailed full-order discrete-time modeling and stability prediction of the single-phase dual active bridge DC-DC converter
by: Iqbal, Mohammad Tauquir, et al.
Published: (2023)