Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches

The common objectives in permutation flowshop scheduling problem are to minimize the total completion time or formally called as makespan and tardiness. Artificial Bee Colony (ABC) algorithm is one of the methods used to solve the flowshop scheduling problem but only a few researches have been found...

Full description

Bibliographic Details
Main Author: Mohd Pauzi, Nur Fazlinda
Format: Thesis
Language:English
English
English
Published: 2015
Subjects:
Online Access:http://eprints.uthm.edu.my/1659/2/NUR%20FAZLINDA%20MOHD%20PAUZI%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/1659/1/24p%20NUR%20FAZLINDA%20MOHD%20PAUZI.pdf
http://eprints.uthm.edu.my/1659/3/NUR%20FAZLINDA%20MOHD%20PAUZI%20WATERMARK.pdf
_version_ 1796868502658744320
author Mohd Pauzi, Nur Fazlinda
author_facet Mohd Pauzi, Nur Fazlinda
author_sort Mohd Pauzi, Nur Fazlinda
collection UTHM
description The common objectives in permutation flowshop scheduling problem are to minimize the total completion time or formally called as makespan and tardiness. Artificial Bee Colony (ABC) algorithm is one of the methods used to solve the flowshop scheduling problem but only a few researches have been found using this method in this area. Therefore, ABC algorithm is proposed to solve the flowshop scheduling problem in this research. The main objective of this research is to develop a computer program with capability of manipulating the onlooker bee approaches in ABC Algorithm for solving flowshop scheduling problem. The research also analyzes the performance of the ABC algorithm using three different onlooker bee approaches. A simulation computer program was developed using Visual Basic Editor in Microsoft excel 2007. In this simulation, onlooker bees as the important bee make decision to choose the specific method. The performance of the ABC algorithm was evaluated through three different onlooker approaches i.e. method 3+0+0 (three onlooker bees are dedicated to the best employee bee), method 2+1+0 (two onlooker bees are dedicated to the best employee bee and one onlooker bee is dedicated to second best employee bee) and method 1+1+1 (one onlooker bee is dedicated to each employee bee). All the average percentage makespan difference from three onlooker approaches was compared and the lowest average percentage makespan difference was selected as the best method. The simulation results indicated that method 2+1+0 produces best result at low iterations of 102 and below. At high iterations of 204 and above, method 3+0+0 dominates the best performance. Based on this finding, the selection of the best method can be decided based on the iteration time available. If iteration available is long, method 3+0+0 is more appropriate, otherwise method 2+1+0 is the best choice. The findings from this research can be used by system developer or computer programmer to search the optimum sequence during the manufacturing process and improve the flowshop scheduling.
first_indexed 2024-03-05T21:40:44Z
format Thesis
id uthm.eprints-1659
institution Universiti Tun Hussein Onn Malaysia
language English
English
English
last_indexed 2024-03-05T21:40:44Z
publishDate 2015
record_format dspace
spelling uthm.eprints-16592021-10-04T08:18:34Z http://eprints.uthm.edu.my/1659/ Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches Mohd Pauzi, Nur Fazlinda TS155-194 Production management. Operations management The common objectives in permutation flowshop scheduling problem are to minimize the total completion time or formally called as makespan and tardiness. Artificial Bee Colony (ABC) algorithm is one of the methods used to solve the flowshop scheduling problem but only a few researches have been found using this method in this area. Therefore, ABC algorithm is proposed to solve the flowshop scheduling problem in this research. The main objective of this research is to develop a computer program with capability of manipulating the onlooker bee approaches in ABC Algorithm for solving flowshop scheduling problem. The research also analyzes the performance of the ABC algorithm using three different onlooker bee approaches. A simulation computer program was developed using Visual Basic Editor in Microsoft excel 2007. In this simulation, onlooker bees as the important bee make decision to choose the specific method. The performance of the ABC algorithm was evaluated through three different onlooker approaches i.e. method 3+0+0 (three onlooker bees are dedicated to the best employee bee), method 2+1+0 (two onlooker bees are dedicated to the best employee bee and one onlooker bee is dedicated to second best employee bee) and method 1+1+1 (one onlooker bee is dedicated to each employee bee). All the average percentage makespan difference from three onlooker approaches was compared and the lowest average percentage makespan difference was selected as the best method. The simulation results indicated that method 2+1+0 produces best result at low iterations of 102 and below. At high iterations of 204 and above, method 3+0+0 dominates the best performance. Based on this finding, the selection of the best method can be decided based on the iteration time available. If iteration available is long, method 3+0+0 is more appropriate, otherwise method 2+1+0 is the best choice. The findings from this research can be used by system developer or computer programmer to search the optimum sequence during the manufacturing process and improve the flowshop scheduling. 2015-06 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/1659/2/NUR%20FAZLINDA%20MOHD%20PAUZI%20COPYRIGHT%20DECLARATION.pdf text en http://eprints.uthm.edu.my/1659/1/24p%20NUR%20FAZLINDA%20MOHD%20PAUZI.pdf text en http://eprints.uthm.edu.my/1659/3/NUR%20FAZLINDA%20MOHD%20PAUZI%20WATERMARK.pdf Mohd Pauzi, Nur Fazlinda (2015) Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches. Masters thesis, Universiti Tun Hussein Onn Malaysia.
spellingShingle TS155-194 Production management. Operations management
Mohd Pauzi, Nur Fazlinda
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
title Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
title_full Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
title_fullStr Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
title_full_unstemmed Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
title_short Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
title_sort flowshop scheduling using artificial bee colony abc algorithm with varying onlooker bees approaches
topic TS155-194 Production management. Operations management
url http://eprints.uthm.edu.my/1659/2/NUR%20FAZLINDA%20MOHD%20PAUZI%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/1659/1/24p%20NUR%20FAZLINDA%20MOHD%20PAUZI.pdf
http://eprints.uthm.edu.my/1659/3/NUR%20FAZLINDA%20MOHD%20PAUZI%20WATERMARK.pdf
work_keys_str_mv AT mohdpauzinurfazlinda flowshopschedulingusingartificialbeecolonyabcalgorithmwithvaryingonlookerbeesapproaches