Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
The common objectives in permutation flowshop scheduling problem are to minimize the total completion time or formally called as makespan and tardiness. Artificial Bee Colony (ABC) algorithm is one of the methods used to solve the flowshop scheduling problem but only a few researches have been found...
Main Author: | Mohd Pauzi, Nur Fazlinda |
---|---|
Format: | Thesis |
Language: | English English English |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/1659/2/NUR%20FAZLINDA%20MOHD%20PAUZI%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/1659/1/24p%20NUR%20FAZLINDA%20MOHD%20PAUZI.pdf http://eprints.uthm.edu.my/1659/3/NUR%20FAZLINDA%20MOHD%20PAUZI%20WATERMARK.pdf |
Similar Items
-
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021) -
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017) -
The master production schedule in MRP for microelectronic manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020) -
Schedule based material requirements planning: a case study of LCD TV manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020) -
Simulation of ant colony optimization on hole making performance
by: Abdullah, Haslina, et al.
Published: (2018)