Multi-facts devices installation for loss minimization and techno-economic impact assessment using EPSO approach
This thesis presents a new meta-heuristic approach technique for optimal location and sizing of multi-unit Flexible Alternating Currents System (FACTS) device installation using single- and multi-objective problems. It also considers techno-economic impact in the system. In this research, the...
Main Author: | Jumaat, Siti Amely |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/1747/1/24p%20SITI%20AMELY%20JUMAAT.pdf |
Similar Items
-
Optimal location of capacitor bank for power losses minimization
by: Che Ros, Ziana
Published: (2013) -
Transmission losses cost allocation in restructed electricity market environment
by: Jaini, Nur ‘Afiqah
Published: (2014) -
Analisis talian penghantaran kuasa sistem Dwi-Litar tiga-fasa dan sistem enam-fasa
by: Jumaat, Siti Amely
Published: (2004) -
Determination of space charge characteristics on contaminated XLPE insulator
by: Mohd Razib, Siti Nabilah
Published: (2019) -
Multi criteria decision making on load shedding scheme in an islanded system
by: Jakuil, Alester G
Published: (2013)