Structural relationship model of causes and effects of construction changes in UAE construction industry

Studies have shown that changes happened in late construction project phases contributed in major failure of a project. Hence, this study is intended to develop structural relationship model of causes and effects for construction changes from the perspective of the UAE construction practitioners. Th...

Full description

Bibliographic Details
Main Author: Al Ameri, Abdulla Eissa Saleh
Format: Thesis
Language:English
English
English
Published: 2021
Subjects:
Online Access:http://eprints.uthm.edu.my/1769/2/ABDULLA%20EISSA%20SALEH%20AL%20AMERI%20-%20declaration.pdf
http://eprints.uthm.edu.my/1769/1/ABDULLA%20EISSA%20SALEH%20AL%20AMERI%20-%2024p.pdf
http://eprints.uthm.edu.my/1769/3/ABDULLA%20EISSA%20SALEH%20AL%20AMERI%20-%20fulltext.pdf
_version_ 1825709601720369152
author Al Ameri, Abdulla Eissa Saleh
author_facet Al Ameri, Abdulla Eissa Saleh
author_sort Al Ameri, Abdulla Eissa Saleh
collection UTHM
description Studies have shown that changes happened in late construction project phases contributed in major failure of a project. Hence, this study is intended to develop structural relationship model of causes and effects for construction changes from the perspective of the UAE construction practitioners. This study was carried out using a quantitative approach with the respondents coming from managerial level working that are working on mega construction projects. The questionnaire was validated using pilot study by 28 construction experts with the outcome that shown that all the 58 causes were categorised into 3 groups (client, contractor, and consultant) and 48 effects were categorised into 3 groups (time overrun, cost overrun, and quality assurance). Next, the actual survey came with 100 valid responses and the data collected from the survey were analysed descriptively. The results found that the most influential construction change causes affecting a project’s performance is the lack of coordination, while the most challenging construction changes effects were the delay in completion. The collected data were further tested by using PLS-SEM relationship model and found that the model has achieved all the assessment criteria with goodness-of-fit index of 0.404 which validated the model. It also found that the relationship of construction changes triggered by contractor has significant effect on time, cost and quality of the project. To ensure that the model is applicable to the UAE construction industry, face validation by selected construction experts was conducted and found that all experts agreed on the model. Hence, this study has shown the importance of identifying construction change causes and effects that it could be useful being practiced by the UAE construction industry.
first_indexed 2024-03-05T21:41:03Z
format Thesis
id uthm.eprints-1769
institution Universiti Tun Hussein Onn Malaysia
language English
English
English
last_indexed 2024-03-05T21:41:03Z
publishDate 2021
record_format dspace
spelling uthm.eprints-17692021-10-11T01:13:27Z http://eprints.uthm.edu.my/1769/ Structural relationship model of causes and effects of construction changes in UAE construction industry Al Ameri, Abdulla Eissa Saleh TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction Studies have shown that changes happened in late construction project phases contributed in major failure of a project. Hence, this study is intended to develop structural relationship model of causes and effects for construction changes from the perspective of the UAE construction practitioners. This study was carried out using a quantitative approach with the respondents coming from managerial level working that are working on mega construction projects. The questionnaire was validated using pilot study by 28 construction experts with the outcome that shown that all the 58 causes were categorised into 3 groups (client, contractor, and consultant) and 48 effects were categorised into 3 groups (time overrun, cost overrun, and quality assurance). Next, the actual survey came with 100 valid responses and the data collected from the survey were analysed descriptively. The results found that the most influential construction change causes affecting a project’s performance is the lack of coordination, while the most challenging construction changes effects were the delay in completion. The collected data were further tested by using PLS-SEM relationship model and found that the model has achieved all the assessment criteria with goodness-of-fit index of 0.404 which validated the model. It also found that the relationship of construction changes triggered by contractor has significant effect on time, cost and quality of the project. To ensure that the model is applicable to the UAE construction industry, face validation by selected construction experts was conducted and found that all experts agreed on the model. Hence, this study has shown the importance of identifying construction change causes and effects that it could be useful being practiced by the UAE construction industry. 2021-02 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/1769/2/ABDULLA%20EISSA%20SALEH%20AL%20AMERI%20-%20declaration.pdf text en http://eprints.uthm.edu.my/1769/1/ABDULLA%20EISSA%20SALEH%20AL%20AMERI%20-%2024p.pdf text en http://eprints.uthm.edu.my/1769/3/ABDULLA%20EISSA%20SALEH%20AL%20AMERI%20-%20fulltext.pdf Al Ameri, Abdulla Eissa Saleh (2021) Structural relationship model of causes and effects of construction changes in UAE construction industry. Doctoral thesis, Universiti Tun Hussein Onn Malaysia.
spellingShingle TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
Al Ameri, Abdulla Eissa Saleh
Structural relationship model of causes and effects of construction changes in UAE construction industry
title Structural relationship model of causes and effects of construction changes in UAE construction industry
title_full Structural relationship model of causes and effects of construction changes in UAE construction industry
title_fullStr Structural relationship model of causes and effects of construction changes in UAE construction industry
title_full_unstemmed Structural relationship model of causes and effects of construction changes in UAE construction industry
title_short Structural relationship model of causes and effects of construction changes in UAE construction industry
title_sort structural relationship model of causes and effects of construction changes in uae construction industry
topic TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
url http://eprints.uthm.edu.my/1769/2/ABDULLA%20EISSA%20SALEH%20AL%20AMERI%20-%20declaration.pdf
http://eprints.uthm.edu.my/1769/1/ABDULLA%20EISSA%20SALEH%20AL%20AMERI%20-%2024p.pdf
http://eprints.uthm.edu.my/1769/3/ABDULLA%20EISSA%20SALEH%20AL%20AMERI%20-%20fulltext.pdf
work_keys_str_mv AT alameriabdullaeissasaleh structuralrelationshipmodelofcausesandeffectsofconstructionchangesinuaeconstructionindustry