Improvement of the SAG ampacity carrying level of existing 275 kV overhead line tower by using the re-conductoring approach
This project presents a methodological approach, suggestions and information in uprating the existing 275kV transmission overhead line by using the re-conductoring approach. Overhead transmission line conductors were given priority in information. Calculation regarding the maximum sag and maximum...
Main Author: | Mahmod, Luqman Hakim |
---|---|
Format: | Thesis |
Language: | English English English |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/2272/1/24p%20LUQMAN%20HAKIM%20MAHMOD.pdf http://eprints.uthm.edu.my/2272/2/LUQMAN%20HAKIM%20MAHMOD%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/2272/3/LUQMAN%20HAKIM%20MAHMOD%20WATERMARK.pdf |
Similar Items
-
Planning and conducting magnetic field level measurement from overhead transmission line
by: Luqman, H.M., et al.
Published: (2017) -
Study on 6, 12 and 24 pulses D-STATCOM for voltage SAG mitigation
by: Mohmad Akil, Mohamad Amirul
Published: (2020) -
Simulation of linear feedback control of D-STATCOM for voltage sag mitigation
by: Zulkifli, Shamsul Aizam
Published: (2005) -
Fuse blow scheme and its impact on overhead distribution system reliability
by: Bajerai, Qaddafi Abdullah
Published: (2014) -
Stability assessment of 132kV Sabah grid-connected solar pV system
by: Liau, Agnes Siau Wei
Published: (2014)