Schedule based material requirements planning: a case study of LCD TV manufacturer
The tools used by management to achieve its initial objectives is Production Planning and Control (PPC). PPC is used to propose the basic issues of utilization of its resources, inventory management and its low productivity. This is because the production system consists of four factors – quality, q...
Main Authors: | , , , , , |
---|---|
Format: | Book Section |
Language: | English |
Published: |
Penerbit UTHM
2020
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/3205/1/Ch01.pdf |
_version_ | 1825637032060256256 |
---|---|
author | Cheam, Kai Wen Mohd Nor, Norasmiha Shahkirin, Ahmad Haiqal Jaafar, Muhamad Zamakhsyari Mhd Zamaludin, Nabilah Afrina Misnan, Nur Aini Nasihah |
author2 | Mohd Nor, Norasmiha |
author_facet | Mohd Nor, Norasmiha Cheam, Kai Wen Mohd Nor, Norasmiha Shahkirin, Ahmad Haiqal Jaafar, Muhamad Zamakhsyari Mhd Zamaludin, Nabilah Afrina Misnan, Nur Aini Nasihah |
author_sort | Cheam, Kai Wen |
collection | UTHM |
description | The tools used by management to achieve its initial objectives is Production Planning and Control (PPC). PPC is used to propose the basic issues of utilization of its resources, inventory management and its low productivity. This is because the production system consists of four factors – quality, quantity, time and cost (Wikner J. O., 2000). |
first_indexed | 2024-03-05T21:45:10Z |
format | Book Section |
id | uthm.eprints-3205 |
institution | Universiti Tun Hussein Onn Malaysia |
language | English |
last_indexed | 2024-03-05T21:45:10Z |
publishDate | 2020 |
publisher | Penerbit UTHM |
record_format | dspace |
spelling | uthm.eprints-32052022-01-04T04:06:07Z http://eprints.uthm.edu.my/3205/ Schedule based material requirements planning: a case study of LCD TV manufacturer Cheam, Kai Wen Mohd Nor, Norasmiha Shahkirin, Ahmad Haiqal Jaafar, Muhamad Zamakhsyari Mhd Zamaludin, Nabilah Afrina Misnan, Nur Aini Nasihah TS155-194 Production management. Operations management The tools used by management to achieve its initial objectives is Production Planning and Control (PPC). PPC is used to propose the basic issues of utilization of its resources, inventory management and its low productivity. This is because the production system consists of four factors – quality, quantity, time and cost (Wikner J. O., 2000). Penerbit UTHM Mohd Nor, Norasmiha Cheam, Kai Wen 2020 Book Section PeerReviewed text en http://eprints.uthm.edu.my/3205/1/Ch01.pdf Cheam, Kai Wen and Mohd Nor, Norasmiha and Shahkirin, Ahmad Haiqal and Jaafar, Muhamad Zamakhsyari and Mhd Zamaludin, Nabilah Afrina and Misnan, Nur Aini Nasihah (2020) Schedule based material requirements planning: a case study of LCD TV manufacturer. In: Material Requirements Planning. Penerbit UTHM, pp. 1-23. ISBN 978-967-2916-53-6 |
spellingShingle | TS155-194 Production management. Operations management Cheam, Kai Wen Mohd Nor, Norasmiha Shahkirin, Ahmad Haiqal Jaafar, Muhamad Zamakhsyari Mhd Zamaludin, Nabilah Afrina Misnan, Nur Aini Nasihah Schedule based material requirements planning: a case study of LCD TV manufacturer |
title | Schedule based material requirements planning: a case study of LCD TV manufacturer |
title_full | Schedule based material requirements planning: a case study of LCD TV manufacturer |
title_fullStr | Schedule based material requirements planning: a case study of LCD TV manufacturer |
title_full_unstemmed | Schedule based material requirements planning: a case study of LCD TV manufacturer |
title_short | Schedule based material requirements planning: a case study of LCD TV manufacturer |
title_sort | schedule based material requirements planning a case study of lcd tv manufacturer |
topic | TS155-194 Production management. Operations management |
url | http://eprints.uthm.edu.my/3205/1/Ch01.pdf |
work_keys_str_mv | AT cheamkaiwen schedulebasedmaterialrequirementsplanningacasestudyoflcdtvmanufacturer AT mohdnornorasmiha schedulebasedmaterialrequirementsplanningacasestudyoflcdtvmanufacturer AT shahkirinahmadhaiqal schedulebasedmaterialrequirementsplanningacasestudyoflcdtvmanufacturer AT jaafarmuhamadzamakhsyari schedulebasedmaterialrequirementsplanningacasestudyoflcdtvmanufacturer AT mhdzamaludinnabilahafrina schedulebasedmaterialrequirementsplanningacasestudyoflcdtvmanufacturer AT misnannuraininasihah schedulebasedmaterialrequirementsplanningacasestudyoflcdtvmanufacturer |