Preliminary qualitative findings: challenges in large infrastructure projects towards development of innovative performance measurement
Performance measurement system to assess development of large infrastructure project has developed due to the unachieved of high design and technical requirements, excessive cost investments and lack of competent human resources and managerial capabilities. Growing numbers of discrepant of interest...
Main Authors: | Masrom, Md Asrul Nasid, Abd Rahim, Mohd Hilmi Izwan, Mohamed, Sulzakimin, Yunus, Riduan |
---|---|
Format: | Article |
Language: | English |
Published: |
Trans Tech Publications
2015
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/3412/1/AJ%202017%20%2838%29%20Preliminary%20qualitative%20findings%20challenges.pdf |
Similar Items
-
The impact of material management on construction project delivery in Somalia
by: Wayrah, Mohamed Yusuf, et al.
Published: (2021) -
Benefits for public healthcare buildings towards Net Zero
Energy Buildings (NZEBs): initial reviews
by: Sulzakimin, M. Sulzakimin, et al.
Published: (2020) -
Assessing causes of contractual disputes from different type of condition of contracts
by: Che Haron, Roziha, et al.
Published: (2021) -
Legislative challenge to sustainable application of industrialized building system (IBS)
by: Yunus, Riduan, et al.
Published: (2016) -
Kajian masalah kewangan yang dihadapi kontraktor bumiputera semasa fasa pembinaan
by: Abdullah, Hanif, et al.
Published: (2021)