Bim: the setback or solution to project cost issues in Malaysia construction industry?

Malaysia is progressing into Industry Revolution (IR) 4.0 which emphasizes more onto digital, data and artificial intelligence where everything is expected to be automated. However, cost tends to be a major issue at the pioneer stage of embracing technology where Building Information Modelling (B...

Full description

Bibliographic Details
Main Authors: Ang, P S E, Pung, Y L, Tsai, K L, Zulkaply, M NA, Tey, J S, Kasim, N B, Osman, M H, Musa, M K, Abdul Rahman, M A
Format: Conference or Workshop Item
Language:English
Published: 2020
Subjects:
Online Access:http://eprints.uthm.edu.my/4684/1/KP%202020%20%2897%29.pdf
_version_ 1825709889593278464
author Ang, P S E
Pung, Y L
Tsai, K L
Zulkaply, M NA
Tey, J S
Kasim, N B
Osman, M H
Musa, M K
Abdul Rahman, M A
author_facet Ang, P S E
Pung, Y L
Tsai, K L
Zulkaply, M NA
Tey, J S
Kasim, N B
Osman, M H
Musa, M K
Abdul Rahman, M A
author_sort Ang, P S E
collection UTHM
description Malaysia is progressing into Industry Revolution (IR) 4.0 which emphasizes more onto digital, data and artificial intelligence where everything is expected to be automated. However, cost tends to be a major issue at the pioneer stage of embracing technology where Building Information Modelling (BIM) for example tends to be a cost tussle for the current construction industry. Yet, research has shown that BIM is arguably one of the technology platforms in combating the costing issue considering that BIM enables 3D model elements to link to cost and auto-generate quantities which potentially achieve cost-effective project. Due to the conflicting perspectives of how BIM affects project cost issues, it is imperative to investigate the cost-related issues in implementing BIM in the project and to determine how BIM in general positively influences the overall project cost. Qualitative research is adopted in this study. A semi-structured interview was conducted among four professionals who employs BIM in their project. They consist of the assistant manager, senior manager and chief executive officer. The data collected is analysed by utilising Matrix Table for better organisation. The scope of the study is in the Selangor state in which the local construction industry had applied BIM in their construction industry up to the 3D stage. The results showed that the BIM implementation cost is not too burdensome as it is only a one-time cost and does not vary throughout the project period. In addition, the BIM influence on the overall cost of the project is beneficial to the industry. It improves workflow and cost management. In conclusion, BIM is beneficial to the construction industry in the long term. It is important to resolve the costrelated issues for implement BIM and hence, encourage the usage of BIM, especially in the IR 4.0 ecosystem
first_indexed 2024-03-05T21:49:15Z
format Conference or Workshop Item
id uthm.eprints-4684
institution Universiti Tun Hussein Onn Malaysia
language English
last_indexed 2024-03-05T21:49:15Z
publishDate 2020
record_format dspace
spelling uthm.eprints-46842022-01-24T02:47:46Z http://eprints.uthm.edu.my/4684/ Bim: the setback or solution to project cost issues in Malaysia construction industry? Ang, P S E Pung, Y L Tsai, K L Zulkaply, M NA Tey, J S Kasim, N B Osman, M H Musa, M K Abdul Rahman, M A T Technology (General) TH5011-5701 Construction by phase of the work (Building trades) Malaysia is progressing into Industry Revolution (IR) 4.0 which emphasizes more onto digital, data and artificial intelligence where everything is expected to be automated. However, cost tends to be a major issue at the pioneer stage of embracing technology where Building Information Modelling (BIM) for example tends to be a cost tussle for the current construction industry. Yet, research has shown that BIM is arguably one of the technology platforms in combating the costing issue considering that BIM enables 3D model elements to link to cost and auto-generate quantities which potentially achieve cost-effective project. Due to the conflicting perspectives of how BIM affects project cost issues, it is imperative to investigate the cost-related issues in implementing BIM in the project and to determine how BIM in general positively influences the overall project cost. Qualitative research is adopted in this study. A semi-structured interview was conducted among four professionals who employs BIM in their project. They consist of the assistant manager, senior manager and chief executive officer. The data collected is analysed by utilising Matrix Table for better organisation. The scope of the study is in the Selangor state in which the local construction industry had applied BIM in their construction industry up to the 3D stage. The results showed that the BIM implementation cost is not too burdensome as it is only a one-time cost and does not vary throughout the project period. In addition, the BIM influence on the overall cost of the project is beneficial to the industry. It improves workflow and cost management. In conclusion, BIM is beneficial to the construction industry in the long term. It is important to resolve the costrelated issues for implement BIM and hence, encourage the usage of BIM, especially in the IR 4.0 ecosystem 2020 Conference or Workshop Item PeerReviewed text en http://eprints.uthm.edu.my/4684/1/KP%202020%20%2897%29.pdf Ang, P S E and Pung, Y L and Tsai, K L and Zulkaply, M NA and Tey, J S and Kasim, N B and Osman, M H and Musa, M K and Abdul Rahman, M A (2020) Bim: the setback or solution to project cost issues in Malaysia construction industry? In: 2nd International Conference on Civil & Environmental Engineering. http://doi:10.1088/1755-1315/476/1/012011
spellingShingle T Technology (General)
TH5011-5701 Construction by phase of the work (Building trades)
Ang, P S E
Pung, Y L
Tsai, K L
Zulkaply, M NA
Tey, J S
Kasim, N B
Osman, M H
Musa, M K
Abdul Rahman, M A
Bim: the setback or solution to project cost issues in Malaysia construction industry?
title Bim: the setback or solution to project cost issues in Malaysia construction industry?
title_full Bim: the setback or solution to project cost issues in Malaysia construction industry?
title_fullStr Bim: the setback or solution to project cost issues in Malaysia construction industry?
title_full_unstemmed Bim: the setback or solution to project cost issues in Malaysia construction industry?
title_short Bim: the setback or solution to project cost issues in Malaysia construction industry?
title_sort bim the setback or solution to project cost issues in malaysia construction industry
topic T Technology (General)
TH5011-5701 Construction by phase of the work (Building trades)
url http://eprints.uthm.edu.my/4684/1/KP%202020%20%2897%29.pdf
work_keys_str_mv AT angpse bimthesetbackorsolutiontoprojectcostissuesinmalaysiaconstructionindustry
AT pungyl bimthesetbackorsolutiontoprojectcostissuesinmalaysiaconstructionindustry
AT tsaikl bimthesetbackorsolutiontoprojectcostissuesinmalaysiaconstructionindustry
AT zulkaplymna bimthesetbackorsolutiontoprojectcostissuesinmalaysiaconstructionindustry
AT teyjs bimthesetbackorsolutiontoprojectcostissuesinmalaysiaconstructionindustry
AT kasimnb bimthesetbackorsolutiontoprojectcostissuesinmalaysiaconstructionindustry
AT osmanmh bimthesetbackorsolutiontoprojectcostissuesinmalaysiaconstructionindustry
AT musamk bimthesetbackorsolutiontoprojectcostissuesinmalaysiaconstructionindustry
AT abdulrahmanma bimthesetbackorsolutiontoprojectcostissuesinmalaysiaconstructionindustry