The development of flight training operation for Tanjung Laboh airport

Flight training operations is very important to world of aviation today because it is one of the important criteria that drive the industry forward. Many people start to involve themselves into the world of aviation to become a professional pilot, but there are lack of number of flying school availa...

Full description

Bibliographic Details
Main Authors: Mohd Nizam, Muhammad Syazaamirul, Rosly, Nurhayati
Format: Article
Language:English
Published: FAZ Publishing 2019
Subjects:
Online Access:http://eprints.uthm.edu.my/4773/1/AJ%202020%20%2828%29.pdf
_version_ 1796869082670170112
author Mohd Nizam, Muhammad Syazaamirul
Rosly, Nurhayati
author_facet Mohd Nizam, Muhammad Syazaamirul
Rosly, Nurhayati
author_sort Mohd Nizam, Muhammad Syazaamirul
collection UTHM
description Flight training operations is very important to world of aviation today because it is one of the important criteria that drive the industry forward. Many people start to involve themselves into the world of aviation to become a professional pilot, but there are lack of number of flying school available here in Malaysia. Therefore this study will discuss on the planning and future development of flight training operation in LTTL. This airport will be used later to aid in the process of training purpose in order to produce the professional pilot amongst UTHM student in the future. This development will include the design of facilities and the procedure of operation for flight training purposes in LTTL. The regulation from the responsible authority which is CAAM and ICAO has been followed in order to make sure all the facilities is built by following the regulations and its specification, and the procedure of operation for flight training is followed the rules fixed by the authorities body. The design of facility is being proposed and design by using Solidwork 2017, it is design based on the requirement needed by LTTL. Facility which is being propose is runway, hangar, air traffic control tower and fuel storage store. For the procedure of operation, the procedure for take-off and landing is being developed by following the procedure for VFR aircraft since in LTTL all aircraft is using VFR. Besides that, the airspace for LTTL is also being developed by referring to Malaysia’s airspace to identify allowable airspace for training area. The suggested length for runway is obtained based on MTOW of an aircraft. All of the design and procedure of operation is provided by following the regulation being set by authorities’ body
first_indexed 2024-03-05T21:49:30Z
format Article
id uthm.eprints-4773
institution Universiti Tun Hussein Onn Malaysia
language English
last_indexed 2024-03-05T21:49:30Z
publishDate 2019
publisher FAZ Publishing
record_format dspace
spelling uthm.eprints-47732021-12-16T06:05:59Z http://eprints.uthm.edu.my/4773/ The development of flight training operation for Tanjung Laboh airport Mohd Nizam, Muhammad Syazaamirul Rosly, Nurhayati T Technology (General) TL500-777 Aeronautics. Aeronautical engineering Flight training operations is very important to world of aviation today because it is one of the important criteria that drive the industry forward. Many people start to involve themselves into the world of aviation to become a professional pilot, but there are lack of number of flying school available here in Malaysia. Therefore this study will discuss on the planning and future development of flight training operation in LTTL. This airport will be used later to aid in the process of training purpose in order to produce the professional pilot amongst UTHM student in the future. This development will include the design of facilities and the procedure of operation for flight training purposes in LTTL. The regulation from the responsible authority which is CAAM and ICAO has been followed in order to make sure all the facilities is built by following the regulations and its specification, and the procedure of operation for flight training is followed the rules fixed by the authorities body. The design of facility is being proposed and design by using Solidwork 2017, it is design based on the requirement needed by LTTL. Facility which is being propose is runway, hangar, air traffic control tower and fuel storage store. For the procedure of operation, the procedure for take-off and landing is being developed by following the procedure for VFR aircraft since in LTTL all aircraft is using VFR. Besides that, the airspace for LTTL is also being developed by referring to Malaysia’s airspace to identify allowable airspace for training area. The suggested length for runway is obtained based on MTOW of an aircraft. All of the design and procedure of operation is provided by following the regulation being set by authorities’ body FAZ Publishing 2019 Article PeerReviewed text en http://eprints.uthm.edu.my/4773/1/AJ%202020%20%2828%29.pdf Mohd Nizam, Muhammad Syazaamirul and Rosly, Nurhayati (2019) The development of flight training operation for Tanjung Laboh airport. Journal of Aviation and Aerospace Technology, 1 (2). pp. 1-9. ISSN 2682-7433
spellingShingle T Technology (General)
TL500-777 Aeronautics. Aeronautical engineering
Mohd Nizam, Muhammad Syazaamirul
Rosly, Nurhayati
The development of flight training operation for Tanjung Laboh airport
title The development of flight training operation for Tanjung Laboh airport
title_full The development of flight training operation for Tanjung Laboh airport
title_fullStr The development of flight training operation for Tanjung Laboh airport
title_full_unstemmed The development of flight training operation for Tanjung Laboh airport
title_short The development of flight training operation for Tanjung Laboh airport
title_sort development of flight training operation for tanjung laboh airport
topic T Technology (General)
TL500-777 Aeronautics. Aeronautical engineering
url http://eprints.uthm.edu.my/4773/1/AJ%202020%20%2828%29.pdf
work_keys_str_mv AT mohdnizammuhammadsyazaamirul thedevelopmentofflighttrainingoperationfortanjunglabohairport
AT roslynurhayati thedevelopmentofflighttrainingoperationfortanjunglabohairport
AT mohdnizammuhammadsyazaamirul developmentofflighttrainingoperationfortanjunglabohairport
AT roslynurhayati developmentofflighttrainingoperationfortanjunglabohairport