Significant mitigation measures for critical factors of cost overrun in highway projects of Pakistan
Stakeholders of the construction industry and academia are often facing problems of cost overrun. It has been observed that many constructions of highway projects are not completed at the approved cost due to certain factors. The objective of this research is to identify the cost overrun critical fa...
Main Authors: | Sohu, Samiullah, Abdullah, Abd Halid, Nagapan, Sasitharan, Ahmed Jhatial, Ashfaque, Ullah, Kaleem, Ali Bhatti, Imtiaz |
---|---|
Format: | Article |
Language: | English |
Published: |
Engineering, Technology and Applied Science Research (ETASR)
2018
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/5435/1/AJ%202018%20%28182%29.pdf |
Similar Items
-
Causative factors of cost overrun in highway projects of Sindh province of Pakistan
by: Sohu, S, et al.
Published: (2017) -
Development Of Unsignalised Intersection Analysis Procedure For The Malaysian Highway Capacity Manual
[TE176. E73 2007 f rb].
by: Sanik, Mohd Erwan
Published: (2007) -
Ciri laju-aliran jalan arteri : kajian kes di Butterworth, Pulau Pinang, Malaysia [TE175. S961 2005 f rb].
by: Haron, Suria
Published: (2005) -
Penghasilan modul e-pembelajaran : "pembinaan jalan raya"
by: Othman, Asri
Published: (2003) -
Blackspot analysis of road traffic crashes in Surabaya -
Manyar Toll Road, East Java
by: Hartatik, Nurani, et al.
Published: (2021)