Development of a conceptual integrated influential factors (IIF) model of internal stakeholder for construction projects successful completion in Yemen
Accomplishing construction projects within the time specified is seldom the case in Yemen. The funds allocated for the projects are usually not properly utilized. Many large construction projects in Yemen are either delayed, suspended or abandoned. Nonetheless, little exertion has been made to norma...
Main Authors: | Al-Fadhal, Najib, Zainal, Rozlin, Ng, Kim-Soon, Ali Hasaballah, Abdel Hafiz |
---|---|
Format: | Article |
Published: |
American Scientific Publishers
2018
|
Subjects: |
Similar Items
-
Integrated influential factors of internal stakeholder that negatively affecting project successful completion in Yemen
by: AL-Fadhali,, Najib, et al.
Published: (2018) -
The desirability of Integrated Influential Factors (IIFs) model of internal
stakeholder as a panacea to project completion delay in Yemen
by: AL-Fadhali, Najib, et al.
Published: (2019) -
Integrated influential factors (iifs) model of internal stakeholders as an adaptive control system to curb projects completion delay in Yemen
by: Mohammed Al-Fadhali, Najib
Published: (2019) -
Architectural building safety and health performance model for stratified low-cost housing: education and management tool for building managers
by: Akasah, Zainal Abidin, et al.
Published: (2015) -
Develop the concept of sustainable residential college: study a room space
by: Buyung, Mohd Reduan, et al.
Published: (2018)