Theoretical framework of the causes of construction time and cost overruns
Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption fro...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
IOP Publishing
2017
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/5891/1/AJ%202017%20%28700%29.pdf |
_version_ | 1796869274065698816 |
---|---|
author | Ullah, Kaleem Abdullah, Abd Hadi Nagapan, Sasitharan Suhoo, S Khan, M S |
author_facet | Ullah, Kaleem Abdullah, Abd Hadi Nagapan, Sasitharan Suhoo, S Khan, M S |
author_sort | Ullah, Kaleem |
collection | UTHM |
description | Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects. |
first_indexed | 2024-03-05T21:52:25Z |
format | Article |
id | uthm.eprints-5891 |
institution | Universiti Tun Hussein Onn Malaysia |
language | English |
last_indexed | 2024-03-05T21:52:25Z |
publishDate | 2017 |
publisher | IOP Publishing |
record_format | dspace |
spelling | uthm.eprints-58912022-01-24T07:30:50Z http://eprints.uthm.edu.my/5891/ Theoretical framework of the causes of construction time and cost overruns Ullah, Kaleem Abdullah, Abd Hadi Nagapan, Sasitharan Suhoo, S Khan, M S TH845-895 Architectural engineering. Structural engineering of buildings Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects. IOP Publishing 2017 Article PeerReviewed text en http://eprints.uthm.edu.my/5891/1/AJ%202017%20%28700%29.pdf Ullah, Kaleem and Abdullah, Abd Hadi and Nagapan, Sasitharan and Suhoo, S and Khan, M S (2017) Theoretical framework of the causes of construction time and cost overruns. IOP Conference Series: Materials Science and Engineering (MSE), 271 (NIL). pp. 1-8. ISSN 1757-8982 https://dx.doi.org/10.1088/1757-899X/271/1/012032 |
spellingShingle | TH845-895 Architectural engineering. Structural engineering of buildings Ullah, Kaleem Abdullah, Abd Hadi Nagapan, Sasitharan Suhoo, S Khan, M S Theoretical framework of the causes of construction time and cost overruns |
title | Theoretical framework of the causes of construction time and cost overruns |
title_full | Theoretical framework of the causes of construction time and cost overruns |
title_fullStr | Theoretical framework of the causes of construction time and cost overruns |
title_full_unstemmed | Theoretical framework of the causes of construction time and cost overruns |
title_short | Theoretical framework of the causes of construction time and cost overruns |
title_sort | theoretical framework of the causes of construction time and cost overruns |
topic | TH845-895 Architectural engineering. Structural engineering of buildings |
url | http://eprints.uthm.edu.my/5891/1/AJ%202017%20%28700%29.pdf |
work_keys_str_mv | AT ullahkaleem theoreticalframeworkofthecausesofconstructiontimeandcostoverruns AT abdullahabdhadi theoreticalframeworkofthecausesofconstructiontimeandcostoverruns AT nagapansasitharan theoreticalframeworkofthecausesofconstructiontimeandcostoverruns AT suhoos theoreticalframeworkofthecausesofconstructiontimeandcostoverruns AT khanms theoreticalframeworkofthecausesofconstructiontimeandcostoverruns |