Summary: | Material requirement planning (MRP) is one of production planning and control (PPC) concept
used for short-term scheduling. Sibawaih Ventures faced problem in handling customer order
when their business receive more order than usual. A case study is conducted to T-shirt A
production to assist Sibawaih Ventures in planning their production. By studying product structure
of T-shirt A and dependency of each part, as well as lead time required to complete T-shirt A,
MRP schedule is generated. MRP schedule shows that, Sibawaih Ventures can produce 800 t�shirts in 7 days time, thus, customer orders can be met in a timely manner. MRP schedule
provides all information provided by production people to run production, while management can
use MRP schedule to control and monitor production accordingly.
|