The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay

Project performance can be enhanced via proper risk management, particularly with the development of risk response measures. Though delay issues have been explored in many studies, to date, no study has attempted to measure how delay factors and risk measures are associated with the project pe...

Full description

Bibliographic Details
Main Author: Karunakaran, Priyadatchini
Format: Thesis
Language:English
English
English
Published: 2020
Subjects:
Online Access:http://eprints.uthm.edu.my/941/1/24p%20PRIYADATCHINI%20KARUNAKARAN.pdf
http://eprints.uthm.edu.my/941/3/PRIYADATCHINI%20KARUNAKARAN%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/941/2/PRIYADATCHINI%20KARUNAKARAN%20WATERMARK.pdf
_version_ 1825636581825839104
author Karunakaran, Priyadatchini
author_facet Karunakaran, Priyadatchini
author_sort Karunakaran, Priyadatchini
collection UTHM
description Project performance can be enhanced via proper risk management, particularly with the development of risk response measures. Though delay issues have been explored in many studies, to date, no study has attempted to measure how delay factors and risk measures are associated with the project performance. Therefore, the aim of this study is to establish the framework of the direct and indirect effect of project risk response�related measures (RM) on project performance (PP) in managing project-related delay factors (DF) in Malaysian construction companies. A total of 332 questionnaire responses were collected from Grade 7 contractors via posts, online survey, email, and by hand. The data was examined using Statistical Package of Social Sciences and Structural Equation Modelling. The result of the study showed that all RMs have significant effect on time and cost performance, except for corrective-related measures and their effect on time performance. Both the DF and RM have a significant effect on PP. Also, the mediating effect was found to be significant on PP. This research provides guidelines for construction practitioners and decision makers on identifying critical delay issues and ways to deal with it with effective risk response measures in order to enhance the project performance. This research also benefits the researchers to have a clear view of the theoretical parts and comprehensive analyses in dealing with delays in the construction industry. This research highly recommends the researchers to further explore on risk behaviour from a different point of views to understand a firm’s intention in mitigating risk.
first_indexed 2024-03-05T21:38:55Z
format Thesis
id uthm.eprints-941
institution Universiti Tun Hussein Onn Malaysia
language English
English
English
last_indexed 2024-03-05T21:38:55Z
publishDate 2020
record_format dspace
spelling uthm.eprints-9412021-09-09T06:06:08Z http://eprints.uthm.edu.my/941/ The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay Karunakaran, Priyadatchini TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction Project performance can be enhanced via proper risk management, particularly with the development of risk response measures. Though delay issues have been explored in many studies, to date, no study has attempted to measure how delay factors and risk measures are associated with the project performance. Therefore, the aim of this study is to establish the framework of the direct and indirect effect of project risk response�related measures (RM) on project performance (PP) in managing project-related delay factors (DF) in Malaysian construction companies. A total of 332 questionnaire responses were collected from Grade 7 contractors via posts, online survey, email, and by hand. The data was examined using Statistical Package of Social Sciences and Structural Equation Modelling. The result of the study showed that all RMs have significant effect on time and cost performance, except for corrective-related measures and their effect on time performance. Both the DF and RM have a significant effect on PP. Also, the mediating effect was found to be significant on PP. This research provides guidelines for construction practitioners and decision makers on identifying critical delay issues and ways to deal with it with effective risk response measures in order to enhance the project performance. This research also benefits the researchers to have a clear view of the theoretical parts and comprehensive analyses in dealing with delays in the construction industry. This research highly recommends the researchers to further explore on risk behaviour from a different point of views to understand a firm’s intention in mitigating risk. 2020-10 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/941/1/24p%20PRIYADATCHINI%20KARUNAKARAN.pdf text en http://eprints.uthm.edu.my/941/3/PRIYADATCHINI%20KARUNAKARAN%20COPYRIGHT%20DECLARATION.pdf text en http://eprints.uthm.edu.my/941/2/PRIYADATCHINI%20KARUNAKARAN%20WATERMARK.pdf Karunakaran, Priyadatchini (2020) The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay. Doctoral thesis, Universiti Tun Hussein Onn Malaysia.
spellingShingle TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
Karunakaran, Priyadatchini
The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
title The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
title_full The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
title_fullStr The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
title_full_unstemmed The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
title_short The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
title_sort framework of direct and indirect effect of project risk response related measures on project performance in managing construction delay
topic TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
url http://eprints.uthm.edu.my/941/1/24p%20PRIYADATCHINI%20KARUNAKARAN.pdf
http://eprints.uthm.edu.my/941/3/PRIYADATCHINI%20KARUNAKARAN%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/941/2/PRIYADATCHINI%20KARUNAKARAN%20WATERMARK.pdf
work_keys_str_mv AT karunakaranpriyadatchini theframeworkofdirectandindirecteffectofprojectriskresponserelatedmeasuresonprojectperformanceinmanagingconstructiondelay
AT karunakaranpriyadatchini frameworkofdirectandindirecteffectofprojectriskresponserelatedmeasuresonprojectperformanceinmanagingconstructiondelay