Effectiveness of simulation to compare driller’s and engineer’s methods to control wells in highly deviated fractured basement reservoirs

There are many problems that may occur during drilling, workover, snubbing, and coil tubing. To this extent, occurrence of a kick is considered a serious problem because making a mistake in well control may lead to a catastrophe. Particularly when gas kicks are not properly controlled which eventual...

Full description

Bibliographic Details
Main Authors: Sharafaddin, Osama, Ismail, Issham, Naji, Gehad Mohammed Ahme, AlHamzah, Abdulkareem
Format: Article
Language:English
Published: Slovnaft VURUP a.s 2023
Subjects:
Online Access:http://eprints.utm.my/106199/1/IsshamIsmail2023_EffectivenessofSimulationtoCompareDrillers.pdf
_version_ 1811132289295319040
author Sharafaddin, Osama
Ismail, Issham
Naji, Gehad Mohammed Ahme
AlHamzah, Abdulkareem
author_facet Sharafaddin, Osama
Ismail, Issham
Naji, Gehad Mohammed Ahme
AlHamzah, Abdulkareem
author_sort Sharafaddin, Osama
collection ePrints
description There are many problems that may occur during drilling, workover, snubbing, and coil tubing. To this extent, occurrence of a kick is considered a serious problem because making a mistake in well control may lead to a catastrophe. Particularly when gas kicks are not properly controlled which eventually can escalate into a blowout. Thus, once a gas kick is detected, it has to be circulated out safely and efficiently to the surface while maintaining bottomhole pressure constant. A quick, appropriate, and an effective response to well control is paramount in order not to end up with a surface or underground blowout. Hence, there are many methods available to kill and control the well such as Driller’s method, Engineer’s method, concurrent method, bull-heading method, reverse method, lubricate and bleed method. In this research work a multiphase flow Drillbench simulator was used to conduct a comprehensive comparison between the Driller’s and Engineer’s method to determine the most effective method to kill the well in basement reservoirs. Granitic basement reservoirs are challenging because of the severe shocks, vibrations, heterogeneity, extensive fracture network, high flow rate and unexpected over-pressurized network. Consequently, this shall require proper reaction to kill flowing wells meanwhile avoid affecting other wells within the same network. A case study showed that Engineer’s method has better results and more advantages over Driller’s method since it would require only one circulation to completely kill the well and no potential for further kicks in highly fractured formation.
first_indexed 2024-09-24T00:00:57Z
format Article
id utm.eprints-106199
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-09-24T00:00:57Z
publishDate 2023
publisher Slovnaft VURUP a.s
record_format dspace
spelling utm.eprints-1061992024-06-20T01:52:48Z http://eprints.utm.my/106199/ Effectiveness of simulation to compare driller’s and engineer’s methods to control wells in highly deviated fractured basement reservoirs Sharafaddin, Osama Ismail, Issham Naji, Gehad Mohammed Ahme AlHamzah, Abdulkareem Q Science (General) There are many problems that may occur during drilling, workover, snubbing, and coil tubing. To this extent, occurrence of a kick is considered a serious problem because making a mistake in well control may lead to a catastrophe. Particularly when gas kicks are not properly controlled which eventually can escalate into a blowout. Thus, once a gas kick is detected, it has to be circulated out safely and efficiently to the surface while maintaining bottomhole pressure constant. A quick, appropriate, and an effective response to well control is paramount in order not to end up with a surface or underground blowout. Hence, there are many methods available to kill and control the well such as Driller’s method, Engineer’s method, concurrent method, bull-heading method, reverse method, lubricate and bleed method. In this research work a multiphase flow Drillbench simulator was used to conduct a comprehensive comparison between the Driller’s and Engineer’s method to determine the most effective method to kill the well in basement reservoirs. Granitic basement reservoirs are challenging because of the severe shocks, vibrations, heterogeneity, extensive fracture network, high flow rate and unexpected over-pressurized network. Consequently, this shall require proper reaction to kill flowing wells meanwhile avoid affecting other wells within the same network. A case study showed that Engineer’s method has better results and more advantages over Driller’s method since it would require only one circulation to completely kill the well and no potential for further kicks in highly fractured formation. Slovnaft VURUP a.s 2023 Article PeerReviewed application/pdf en http://eprints.utm.my/106199/1/IsshamIsmail2023_EffectivenessofSimulationtoCompareDrillers.pdf Sharafaddin, Osama and Ismail, Issham and Naji, Gehad Mohammed Ahme and AlHamzah, Abdulkareem (2023) Effectiveness of simulation to compare driller’s and engineer’s methods to control wells in highly deviated fractured basement reservoirs. Petroleum and Coal, 65 (2). pp. 400-408. ISSN 1337-7027 https://www.vurup.sk/petroleum/2023/volume-65/#volume-65-2023-issue-2 NA
spellingShingle Q Science (General)
Sharafaddin, Osama
Ismail, Issham
Naji, Gehad Mohammed Ahme
AlHamzah, Abdulkareem
Effectiveness of simulation to compare driller’s and engineer’s methods to control wells in highly deviated fractured basement reservoirs
title Effectiveness of simulation to compare driller’s and engineer’s methods to control wells in highly deviated fractured basement reservoirs
title_full Effectiveness of simulation to compare driller’s and engineer’s methods to control wells in highly deviated fractured basement reservoirs
title_fullStr Effectiveness of simulation to compare driller’s and engineer’s methods to control wells in highly deviated fractured basement reservoirs
title_full_unstemmed Effectiveness of simulation to compare driller’s and engineer’s methods to control wells in highly deviated fractured basement reservoirs
title_short Effectiveness of simulation to compare driller’s and engineer’s methods to control wells in highly deviated fractured basement reservoirs
title_sort effectiveness of simulation to compare driller s and engineer s methods to control wells in highly deviated fractured basement reservoirs
topic Q Science (General)
url http://eprints.utm.my/106199/1/IsshamIsmail2023_EffectivenessofSimulationtoCompareDrillers.pdf
work_keys_str_mv AT sharafaddinosama effectivenessofsimulationtocomparedrillersandengineersmethodstocontrolwellsinhighlydeviatedfracturedbasementreservoirs
AT ismailissham effectivenessofsimulationtocomparedrillersandengineersmethodstocontrolwellsinhighlydeviatedfracturedbasementreservoirs
AT najigehadmohammedahme effectivenessofsimulationtocomparedrillersandengineersmethodstocontrolwellsinhighlydeviatedfracturedbasementreservoirs
AT alhamzahabdulkareem effectivenessofsimulationtocomparedrillersandengineersmethodstocontrolwellsinhighlydeviatedfracturedbasementreservoirs