Cost effectiveness comparison of pre-fabrication with conventional construction method for RMAF ground defense bunker
Pre-fabrication construction method is not new in Malaysian construction industry yet the utilization of such method still relatively low. Government should conduct thorough study of pre-fabrication method aspects and implement it widely especially for government based projects including national se...
Main Author: | Tan, Swee Kok |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.utm.my/10636/6/TanSweeKokMFKA2010.pdf |
Similar Items
-
Cost comparison for construction of house using conventional and interlocking block method
by: Siti Aishah, Mat Ali
Published: (2012) -
Cost comparison between the construction of conventional method and interlocking block system
by: Nik Farahiyah , Nik Mohamed
Published: (2014) -
The comparison between conventional and industrialized building system formwork towards sustainable construction
by: Mohd Bakri, Muhammad Hassan
Published: (2008) -
Failure costs and cost predictability in construction projects
by: Low, Sook May, et al.
Published: (2013) -
Cost control in construction project of the site
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)