Dispute resolution in relation to delay of construction project
Time has been a major constraint in the project undertaking in Malaysia. Hence, proper works scheduling need to be planned. However, there are always unexpected circumstances out of parties? control for the project processes slipping over its planned schedule and end-up with disputes on delay issues...
Main Author: | Soon, Tan Kian |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.utm.my/11232/6/TanKianSoonMFKA2010.pdf |
Similar Items
-
Minimising construction disputes
by: Wahi, Noraziah
Published: (2008) -
The profile of construction disputes
by: Abidin, Asniah
Published: (2007) -
A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects
by: Nur Nadhirah, Muhammuddin, et al.
Published: (2023) -
A study of delay sources of construction project in Kuantan area
by: Tan, Kean Wei
Published: (2015) -
The causes and effect of delay to handover the project in construction industry
by: Nur Fatihah, Zakeri
Published: (2015)