Delay on the zone establishment work process in non-revenue water reduction project

The difference between amount of water put into the distribution system and the amount of water billed to consumers is termed as Non-Revenue Water (NRW). It is a major issue effecting water utilities in developing countries nowadays. NRW project in Selangor is outsourced so that it could be managed...

Full description

Bibliographic Details
Main Author: Krishnan, Desanan
Format: Thesis
Language:English
Published: 2007
Subjects:
Online Access:http://eprints.utm.my/11293/1/DesananKrishnanMFKA2007.pdf
_version_ 1796854851015016448
author Krishnan, Desanan
author_facet Krishnan, Desanan
author_sort Krishnan, Desanan
collection ePrints
description The difference between amount of water put into the distribution system and the amount of water billed to consumers is termed as Non-Revenue Water (NRW). It is a major issue effecting water utilities in developing countries nowadays. NRW project in Selangor is outsourced so that it could be managed in a more effective manner. Zone establishment is the main scope of work to be done for NRW Phase 2 Project in Selangor. Delay that occurs during the process of zone establishment makes the entire organization to be unorganized due to last minute work preparation and drop in quality of work. This process consists of several activities done by different departments in an organization. This study is done to identify the delay activities, factors that cause the delay and finally a new improved zone establishment work process will be recommended. The main aim of this study is to improve the current zone establishment work process so that delay can be minimized. There will be two stages of data collection and analysis. The first stage will be to identify the delay activities by studying the flow of activities for ten different zones. Identifying the factors that cause delay by interviewing the head of department and personal responsible for the delay will be the second stage of data collection and analysis. Overall there were three main activities that cause the major delay in the work process. Outcome from the interview done to the head of departments and personal responsible of those delay activities has shown indirectly the factors that causes the delay. There are four factors that have been identified and three strong strategies to minimize the problems are suggested. Finally a new improved zone establishment work process has been recommended.
first_indexed 2024-03-05T18:20:12Z
format Thesis
id utm.eprints-11293
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T18:20:12Z
publishDate 2007
record_format dspace
spelling utm.eprints-112932018-07-30T08:39:33Z http://eprints.utm.my/11293/ Delay on the zone establishment work process in non-revenue water reduction project Krishnan, Desanan TC Hydraulic engineering. Ocean engineering The difference between amount of water put into the distribution system and the amount of water billed to consumers is termed as Non-Revenue Water (NRW). It is a major issue effecting water utilities in developing countries nowadays. NRW project in Selangor is outsourced so that it could be managed in a more effective manner. Zone establishment is the main scope of work to be done for NRW Phase 2 Project in Selangor. Delay that occurs during the process of zone establishment makes the entire organization to be unorganized due to last minute work preparation and drop in quality of work. This process consists of several activities done by different departments in an organization. This study is done to identify the delay activities, factors that cause the delay and finally a new improved zone establishment work process will be recommended. The main aim of this study is to improve the current zone establishment work process so that delay can be minimized. There will be two stages of data collection and analysis. The first stage will be to identify the delay activities by studying the flow of activities for ten different zones. Identifying the factors that cause delay by interviewing the head of department and personal responsible for the delay will be the second stage of data collection and analysis. Overall there were three main activities that cause the major delay in the work process. Outcome from the interview done to the head of departments and personal responsible of those delay activities has shown indirectly the factors that causes the delay. There are four factors that have been identified and three strong strategies to minimize the problems are suggested. Finally a new improved zone establishment work process has been recommended. 2007-11 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/11293/1/DesananKrishnanMFKA2007.pdf Krishnan, Desanan (2007) Delay on the zone establishment work process in non-revenue water reduction project. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
spellingShingle TC Hydraulic engineering. Ocean engineering
Krishnan, Desanan
Delay on the zone establishment work process in non-revenue water reduction project
title Delay on the zone establishment work process in non-revenue water reduction project
title_full Delay on the zone establishment work process in non-revenue water reduction project
title_fullStr Delay on the zone establishment work process in non-revenue water reduction project
title_full_unstemmed Delay on the zone establishment work process in non-revenue water reduction project
title_short Delay on the zone establishment work process in non-revenue water reduction project
title_sort delay on the zone establishment work process in non revenue water reduction project
topic TC Hydraulic engineering. Ocean engineering
url http://eprints.utm.my/11293/1/DesananKrishnanMFKA2007.pdf
work_keys_str_mv AT krishnandesanan delayonthezoneestablishmentworkprocessinnonrevenuewaterreductionproject