The development of a business framework and techno-financial model for biomass power plants
Renewable Energy (RE) was included in the 8th Malaysia Plan to ensure a sustainable energy growth for the country. An initial target of 600MW grid connected power plants, fuelled by RE sources, was set by the year 2005. However, their planting up have been sluggish. Only a few of the 62 approvals ha...
Main Author: | Abdul Latif, Abdul Maulud |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2005
|
Subjects: | |
Online Access: | http://eprints.utm.my/1349/1/AbdulMauludAbdulLatifPBATC2005.pdf |
Similar Items
-
The development of a business framework and techno-financial model for biomass power plants /
by: 255768 Abdul Maulud Abdul Latif, et al.
Published: (2006) -
The development of a business framework and techno-financial model for biomass power plants [compact disc]/
by: 255768 Abdul Maulud Abdul Latif, et al.
Published: (2006) -
Physical security measures framework for Marib power plant
by: Mohammed Al-Aghbari, Anas Mustafa
Published: (2013) -
Analyzing utilization of biomass in combined heat and power and combined cooling, heating, and power systems
by: Bagherian, M. A., et al.
Published: (2021) -
Techno-economic analysis of a grid-connected waste to energy gasification plant: a case study
by: Elwan, Ahmed Abubakar, et al.
Published: (2021)