Pedestrian delay at zebra crossing facility

Bibliographic Details
Main Author: Sari , Nadra Mutiara
Format: Thesis
Published: 2010
Subjects:
_version_ 1796855562630070272
author Sari , Nadra Mutiara
author_facet Sari , Nadra Mutiara
author_sort Sari , Nadra Mutiara
collection ePrints
first_indexed 2024-03-05T18:30:22Z
format Thesis
id utm.eprints-16583
institution Universiti Teknologi Malaysia - ePrints
last_indexed 2024-03-05T18:30:22Z
publishDate 2010
record_format dspace
spelling utm.eprints-165832017-09-24T08:39:25Z http://eprints.utm.my/16583/ Pedestrian delay at zebra crossing facility Sari , Nadra Mutiara TA Engineering (General). Civil engineering (General) 2010 Thesis NonPeerReviewed Sari , Nadra Mutiara (2010) Pedestrian delay at zebra crossing facility. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://libraryopac.utm.my/client/en_AU/main/search/results?qu=Pedestrian+delay+at+zebra+crossing+facility&te=
spellingShingle TA Engineering (General). Civil engineering (General)
Sari , Nadra Mutiara
Pedestrian delay at zebra crossing facility
title Pedestrian delay at zebra crossing facility
title_full Pedestrian delay at zebra crossing facility
title_fullStr Pedestrian delay at zebra crossing facility
title_full_unstemmed Pedestrian delay at zebra crossing facility
title_short Pedestrian delay at zebra crossing facility
title_sort pedestrian delay at zebra crossing facility
topic TA Engineering (General). Civil engineering (General)
work_keys_str_mv AT sarinadramutiara pedestriandelayatzebracrossingfacility