Determine the impact of road humps on travel time
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2012
|
Subjects: |
_version_ | 1796856784797827072 |
---|---|
author | Mehrdad Ghaemi, Seyed |
author_facet | Mehrdad Ghaemi, Seyed |
author_sort | Mehrdad Ghaemi, Seyed |
collection | ePrints |
first_indexed | 2024-03-05T18:48:17Z |
format | Thesis |
id | utm.eprints-30714 |
institution | Universiti Teknologi Malaysia - ePrints |
last_indexed | 2024-03-05T18:48:17Z |
publishDate | 2012 |
record_format | dspace |
spelling | utm.eprints-307142017-09-19T03:09:40Z http://eprints.utm.my/30714/ Determine the impact of road humps on travel time Mehrdad Ghaemi, Seyed TA Engineering (General). Civil engineering (General) 2012 Thesis NonPeerReviewed Mehrdad Ghaemi, Seyed (2012) Determine the impact of road humps on travel time. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://libraryopac.utm.my/client/en_AU/main/search/results?qu=Determine+the+impact+of+road+humps+on+travel+time&te=# |
spellingShingle | TA Engineering (General). Civil engineering (General) Mehrdad Ghaemi, Seyed Determine the impact of road humps on travel time |
title | Determine the impact of road humps on travel time |
title_full | Determine the impact of road humps on travel time |
title_fullStr | Determine the impact of road humps on travel time |
title_full_unstemmed | Determine the impact of road humps on travel time |
title_short | Determine the impact of road humps on travel time |
title_sort | determine the impact of road humps on travel time |
topic | TA Engineering (General). Civil engineering (General) |
work_keys_str_mv | AT mehrdadghaemiseyed determinetheimpactofroadhumpsontraveltime |