Time and budget overrun in the construction of town houses in Dubai U.A.E
A construction contract normally have the duration for projects start date and finish date provided by the Client to the Contractor to finish the work. If the contractor is unable to finish the work within a specified finish date, then the Client has the right under a construction contract to impose...
Main Author: | Shaikh, Abdul Wahab |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.utm.my/32135/5/AbdulWahabShaikhMFKA2012.pdf |
Similar Items
-
Time and budget overrun in the construction of town houses in Dubai U.A.E /
by: Abdul Wahab Shaikh, 1971-, et al.
Published: (2012) -
Time and budget overrun in the construction of town houses in Dubai U.A.E [electronic resource] /
by: Abdul Wahab Shaikh, 1971-
Published: (2012) -
A review on causes of cost overrun in the construction projects
by: Albtoush, Faten Ahmad, et al.
Published: (2019) -
A review on causes of cost overrun in the construction projects
by: A. M., Faten Albtoush, et al.
Published: (2019) -
Improvement measures of cost overruns in residential construction project in Malaysia
by: Rahim, Nur Syafika Artika
Published: (2020)