Quantum meruit in construction contracts

Quantum meruit claims can arise in both contract and restitution. It is a claim for the reasonable sum for the work done. In the case of Renard Construction (ME) Pty Ltd v Minister for Public Works[1992] 26 NSWLR 234, Meagher JA held that the contractor was entitled to recover a quantum meruit that...

Full description

Bibliographic Details
Main Author: Mat Jusoh, Zairra
Format: Thesis
Language:English
Published: 2011
Subjects:
Online Access:http://eprints.utm.my/33946/5/ZairraMatJusohMFAB2011.pdf
_version_ 1796857292077924352
author Mat Jusoh, Zairra
author_facet Mat Jusoh, Zairra
author_sort Mat Jusoh, Zairra
collection ePrints
description Quantum meruit claims can arise in both contract and restitution. It is a claim for the reasonable sum for the work done. In the case of Renard Construction (ME) Pty Ltd v Minister for Public Works[1992] 26 NSWLR 234, Meagher JA held that the contractor was entitled to recover a quantum meruit that should be quantified on reasonable remuneration basis, not value of the work basis for work performed. In addition, the contract price did not represent a ceiling to the contractor?s remedy. Similarly, in the case of Murdock v Kennedy [1952] 69 WN (NSW) 191, Street CJ. held that the contract was not conclusive evidence, though it may be strong evidence. By referring to these cases, the courts do not seem to be uniformed in devising formula to for quantifying the reasonable amount for quantum meruit. Hence, this study intends to identify the methods of assessment used to calculate quantum meruit claim. The analysis was carried out by referring to quantum meruit cases in Malaysia construction contract. From the study, there are four methods of assessment used based on the value of work basis which are value of work done plus unfixed material, the cost of labours, materials and others plus percentage profit, the value of work done plus unfixed material less remedial cost and LAD and the balance of progress claim. While, the method of assessment used based on the reasonable remuneration basis is the average of remuneration multiply with duration of work performed. This study also found that quantification of quantum meruit based on reasonable remuneration basis only involves the pre-contract stage as the scope of assessment.
first_indexed 2024-03-05T18:55:29Z
format Thesis
id utm.eprints-33946
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T18:55:29Z
publishDate 2011
record_format dspace
spelling utm.eprints-339462018-05-27T08:11:10Z http://eprints.utm.my/33946/ Quantum meruit in construction contracts Mat Jusoh, Zairra TH Building construction Quantum meruit claims can arise in both contract and restitution. It is a claim for the reasonable sum for the work done. In the case of Renard Construction (ME) Pty Ltd v Minister for Public Works[1992] 26 NSWLR 234, Meagher JA held that the contractor was entitled to recover a quantum meruit that should be quantified on reasonable remuneration basis, not value of the work basis for work performed. In addition, the contract price did not represent a ceiling to the contractor?s remedy. Similarly, in the case of Murdock v Kennedy [1952] 69 WN (NSW) 191, Street CJ. held that the contract was not conclusive evidence, though it may be strong evidence. By referring to these cases, the courts do not seem to be uniformed in devising formula to for quantifying the reasonable amount for quantum meruit. Hence, this study intends to identify the methods of assessment used to calculate quantum meruit claim. The analysis was carried out by referring to quantum meruit cases in Malaysia construction contract. From the study, there are four methods of assessment used based on the value of work basis which are value of work done plus unfixed material, the cost of labours, materials and others plus percentage profit, the value of work done plus unfixed material less remedial cost and LAD and the balance of progress claim. While, the method of assessment used based on the reasonable remuneration basis is the average of remuneration multiply with duration of work performed. This study also found that quantification of quantum meruit based on reasonable remuneration basis only involves the pre-contract stage as the scope of assessment. 2011-07 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/33946/5/ZairraMatJusohMFAB2011.pdf Mat Jusoh, Zairra (2011) Quantum meruit in construction contracts. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment.
spellingShingle TH Building construction
Mat Jusoh, Zairra
Quantum meruit in construction contracts
title Quantum meruit in construction contracts
title_full Quantum meruit in construction contracts
title_fullStr Quantum meruit in construction contracts
title_full_unstemmed Quantum meruit in construction contracts
title_short Quantum meruit in construction contracts
title_sort quantum meruit in construction contracts
topic TH Building construction
url http://eprints.utm.my/33946/5/ZairraMatJusohMFAB2011.pdf
work_keys_str_mv AT matjusohzairra quantummeruitinconstructioncontracts