Development of sand production prediction computer model
During production, sand inflow from poorly consolidated reservoir will cause problems of wear, casing collapse and surface facility deterioration. However, if the sand control completion is used to minimize sand production risk, it may lead to high skins and resulting in large productivity loses. On...
Main Authors: | Samsuri, Ariffin, Sim, Soon Hin |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2001
|
Subjects: | |
Online Access: | http://eprints.utm.my/3516/1/SKMBT_60007052214560.pdf |
Similar Items
-
An integrated simulation model for sand production prediction and sand control
by: Samsuri, Ariffin, et al.
Published: (2002) -
Contribution of collapse perforation to the production of loose sand in the wellbore
by: Samsuri, Ariffin
Published: (1992) -
An Integrated Sand Control Method Evaluation
by: Samsuri, Ariffin, et al.
Published: (2003) -
Minimize sand production by controlling wellbore geometry and flow rate
by: Samsuri, Ariffin, et al.
Published: (2000) -
Development of a performance evaluation method of mechanical sand retention techniques
by: Samsuri, Ariffin, et al.
Published: (2001)