Post-tension column for IBS blockwork building system

Industrialized Building System (IBS) is now a common remark in construction industry. The used of this system have grown rapidly around develop country including Malaysia. This research is mainly focused on the interlocking blockwork system for the residential building house. The concrete blocks wer...

Full description

Bibliographic Details
Main Author: Ayop, Zalilah
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/36565/5/ZalilahAyopMFKA2013.pdf
_version_ 1796857550610628608
author Ayop, Zalilah
author_facet Ayop, Zalilah
author_sort Ayop, Zalilah
collection ePrints
description Industrialized Building System (IBS) is now a common remark in construction industry. The used of this system have grown rapidly around develop country including Malaysia. This research is mainly focused on the interlocking blockwork system for the residential building house. The concrete blocks were assembled by stacking up and jointed together, by the bolt only without the interlocking void in the blocks. The assembly of beam and column are by bolts only. This study focuses on the pretension bolt at the column only. The stress value at the bolt is needed in order to apply pretension or preloading to the bolt. The purpose of this study is to investigate the behaviour of the frame structure of the blockwork system under point loads in both experimental which is constructed in the laboratory and analysis of the structure modeled in finite element analysis software (Abaqus/CAE). The behaviour of the structure observed during the testing was merely the pattern of the crack occurred when the frame is loaded. Based on the analysis that has been performed, the residual stress in the bolt is determined and the actual pretension bolt value in the column is calculated which gives 0.251 kN, while the torque that need to be applied at the nut is 0.102 kNmm
first_indexed 2024-03-05T18:59:27Z
format Thesis
id utm.eprints-36565
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T18:59:27Z
publishDate 2013
record_format dspace
spelling utm.eprints-365652017-09-11T00:28:19Z http://eprints.utm.my/36565/ Post-tension column for IBS blockwork building system Ayop, Zalilah TA Engineering (General). Civil engineering (General) Industrialized Building System (IBS) is now a common remark in construction industry. The used of this system have grown rapidly around develop country including Malaysia. This research is mainly focused on the interlocking blockwork system for the residential building house. The concrete blocks were assembled by stacking up and jointed together, by the bolt only without the interlocking void in the blocks. The assembly of beam and column are by bolts only. This study focuses on the pretension bolt at the column only. The stress value at the bolt is needed in order to apply pretension or preloading to the bolt. The purpose of this study is to investigate the behaviour of the frame structure of the blockwork system under point loads in both experimental which is constructed in the laboratory and analysis of the structure modeled in finite element analysis software (Abaqus/CAE). The behaviour of the structure observed during the testing was merely the pattern of the crack occurred when the frame is loaded. Based on the analysis that has been performed, the residual stress in the bolt is determined and the actual pretension bolt value in the column is calculated which gives 0.251 kN, while the torque that need to be applied at the nut is 0.102 kNmm 2013-01 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/36565/5/ZalilahAyopMFKA2013.pdf Ayop, Zalilah (2013) Post-tension column for IBS blockwork building system. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
spellingShingle TA Engineering (General). Civil engineering (General)
Ayop, Zalilah
Post-tension column for IBS blockwork building system
title Post-tension column for IBS blockwork building system
title_full Post-tension column for IBS blockwork building system
title_fullStr Post-tension column for IBS blockwork building system
title_full_unstemmed Post-tension column for IBS blockwork building system
title_short Post-tension column for IBS blockwork building system
title_sort post tension column for ibs blockwork building system
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/36565/5/ZalilahAyopMFKA2013.pdf
work_keys_str_mv AT ayopzalilah posttensioncolumnforibsblockworkbuildingsystem