Use of discretion by contract principal
Contract administrator constantly faces the challenge of selecting the right procurement method in tandem with the basic need to achieve required performance in cost, time and quality. To achieve the required performance, tender process is carried out in which the contract administrator states the r...
Main Author: | Tuah, Mohd. Zaidi |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://eprints.utm.my/36676/1/MohdZaidiTuahMFAB2011.pdf |
Similar Items
-
Users' perception of energy efficiency in school design
by: Mohd. Salleh, Mohd. Najib, et al.
Published: (2015) -
Building developer`s approach to safety in the construction industry
by: Mahmoud, Abubakar Sadiq, et al.
Published: (2020) -
Halangan pemilikan rumah dan insentif kerajaan
by: Zainal, Mohd. Nizam
Published: (2020) -
Parametric analysis of building elements on building energy use
by: Mottahedi, Mottahedi M., Mohammadpour A., Amiri S.S., Asadi S., Riley D., S, et al.
Published: (2015) -
Potensi pembangunan cohousing sebagai perumahan khas warga emas bandar ke arah penuaan aktif
by: Md. Zain, Mohd. Rizal
Published: (2020)