The performance of Felda Plantations Sdn. Bhd. contractors
Performance is the measure of the ability of the contractors to execute work on time, cost and quality. This study presents the result of the investigation on performance of the contractor that registered under Felda Plantations Sdn. Bhd based on workmanship. The objectives of the study are to ident...
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/3718/1/RamziIbrahimMFKA2006.pdf |
_version_ | 1825909436810526720 |
---|---|
author | Ibrahim, Ramzi |
author_facet | Ibrahim, Ramzi |
author_sort | Ibrahim, Ramzi |
collection | ePrints |
description | Performance is the measure of the ability of the contractors to execute work on time, cost and quality. This study presents the result of the investigation on performance of the contractor that registered under Felda Plantations Sdn. Bhd based on workmanship. The objectives of the study are to identify the factors that influence the contractor’s performance; to establish the critical factors that influence their performance; and to identify the strategies to improve the situation. The method of the study involved literature review, data collection and analysis is using an Average Index method. The result for this study is found that the three most important factors that influence the contractors performance were the experience and skilled worker; understand the method of work; and good planning and scheduling . The three best method to improve the contractor’s performance were to focus on the client needs; meet the client requirements; and exceed the client expectation; to improve the method of supervision of labors work and to improve the planning and scheduling techniques. It is hope that this study will provide useful information on future work for contractors not only for their future jobs at Felda Plantations Sdn. Bhd. but to the benefit to the construction industry |
first_indexed | 2024-03-05T18:02:08Z |
format | Thesis |
id | utm.eprints-3718 |
institution | Universiti Teknologi Malaysia - ePrints |
language | English |
last_indexed | 2024-03-05T18:02:08Z |
publishDate | 2006 |
record_format | dspace |
spelling | utm.eprints-37182018-01-10T04:37:19Z http://eprints.utm.my/3718/ The performance of Felda Plantations Sdn. Bhd. contractors Ibrahim, Ramzi HD Industries. Land use. Labor TA Engineering (General). Civil engineering (General) Performance is the measure of the ability of the contractors to execute work on time, cost and quality. This study presents the result of the investigation on performance of the contractor that registered under Felda Plantations Sdn. Bhd based on workmanship. The objectives of the study are to identify the factors that influence the contractor’s performance; to establish the critical factors that influence their performance; and to identify the strategies to improve the situation. The method of the study involved literature review, data collection and analysis is using an Average Index method. The result for this study is found that the three most important factors that influence the contractors performance were the experience and skilled worker; understand the method of work; and good planning and scheduling . The three best method to improve the contractor’s performance were to focus on the client needs; meet the client requirements; and exceed the client expectation; to improve the method of supervision of labors work and to improve the planning and scheduling techniques. It is hope that this study will provide useful information on future work for contractors not only for their future jobs at Felda Plantations Sdn. Bhd. but to the benefit to the construction industry 2006-05 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/3718/1/RamziIbrahimMFKA2006.pdf Ibrahim, Ramzi (2006) The performance of Felda Plantations Sdn. Bhd. contractors. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. |
spellingShingle | HD Industries. Land use. Labor TA Engineering (General). Civil engineering (General) Ibrahim, Ramzi The performance of Felda Plantations Sdn. Bhd. contractors |
title | The performance of Felda Plantations Sdn. Bhd. contractors |
title_full | The performance of Felda Plantations Sdn. Bhd. contractors |
title_fullStr | The performance of Felda Plantations Sdn. Bhd. contractors |
title_full_unstemmed | The performance of Felda Plantations Sdn. Bhd. contractors |
title_short | The performance of Felda Plantations Sdn. Bhd. contractors |
title_sort | performance of felda plantations sdn bhd contractors |
topic | HD Industries. Land use. Labor TA Engineering (General). Civil engineering (General) |
url | http://eprints.utm.my/3718/1/RamziIbrahimMFKA2006.pdf |
work_keys_str_mv | AT ibrahimramzi theperformanceoffeldaplantationssdnbhdcontractors AT ibrahimramzi performanceoffeldaplantationssdnbhdcontractors |