A critical review of the reinforced concrete columns and walls concealing rain water pipe in multistorey buildings

Various problems and deficiencies in the strength and load carrying capacity of the reinforced concrete (RC) walls and columns caused by concealing PVC drain pipes within them have been identified. Alternative methods of positioning the drain pipes outside the columns are proposed. An improved metho...

Full description

Bibliographic Details
Main Authors: Bakhteri, Jahangir, Omar, Wahid, Makhtar, Ahmad Mahir
Format: Article
Language:English
Published: Faculty of Civil Engineering 2002
Subjects:
Online Access:http://eprints.utm.my/3769/1/WahidOmar2002_ACriticalReviewoftheReinforced.pdf
_version_ 1825909444835278848
author Bakhteri, Jahangir
Omar, Wahid
Makhtar, Ahmad Mahir
author_facet Bakhteri, Jahangir
Omar, Wahid
Makhtar, Ahmad Mahir
author_sort Bakhteri, Jahangir
collection ePrints
description Various problems and deficiencies in the strength and load carrying capacity of the reinforced concrete (RC) walls and columns caused by concealing PVC drain pipes within them have been identified. Alternative methods of positioning the drain pipes outside the columns are proposed. An improved method of the present practice has also been suggested. Finally, the research methodology and investigation of this problem which is presently in progress in the Universiti Teknologi Malaysia, Skudai, has been outlined
first_indexed 2024-03-05T18:02:15Z
format Article
id utm.eprints-3769
institution Universiti Teknologi Malaysia - ePrints
language English
last_indexed 2024-03-05T18:02:15Z
publishDate 2002
publisher Faculty of Civil Engineering
record_format dspace
spelling utm.eprints-37692010-09-27T07:38:04Z http://eprints.utm.my/3769/ A critical review of the reinforced concrete columns and walls concealing rain water pipe in multistorey buildings Bakhteri, Jahangir Omar, Wahid Makhtar, Ahmad Mahir TA Engineering (General). Civil engineering (General) Various problems and deficiencies in the strength and load carrying capacity of the reinforced concrete (RC) walls and columns caused by concealing PVC drain pipes within them have been identified. Alternative methods of positioning the drain pipes outside the columns are proposed. An improved method of the present practice has also been suggested. Finally, the research methodology and investigation of this problem which is presently in progress in the Universiti Teknologi Malaysia, Skudai, has been outlined Faculty of Civil Engineering 2002 Article PeerReviewed application/pdf en http://eprints.utm.my/3769/1/WahidOmar2002_ACriticalReviewoftheReinforced.pdf Bakhteri, Jahangir and Omar, Wahid and Makhtar, Ahmad Mahir (2002) A critical review of the reinforced concrete columns and walls concealing rain water pipe in multistorey buildings. Jurnal Kejuruteraan Awam, 14 (2). pp. 39-52. ISSN 1823-7843
spellingShingle TA Engineering (General). Civil engineering (General)
Bakhteri, Jahangir
Omar, Wahid
Makhtar, Ahmad Mahir
A critical review of the reinforced concrete columns and walls concealing rain water pipe in multistorey buildings
title A critical review of the reinforced concrete columns and walls concealing rain water pipe in multistorey buildings
title_full A critical review of the reinforced concrete columns and walls concealing rain water pipe in multistorey buildings
title_fullStr A critical review of the reinforced concrete columns and walls concealing rain water pipe in multistorey buildings
title_full_unstemmed A critical review of the reinforced concrete columns and walls concealing rain water pipe in multistorey buildings
title_short A critical review of the reinforced concrete columns and walls concealing rain water pipe in multistorey buildings
title_sort critical review of the reinforced concrete columns and walls concealing rain water pipe in multistorey buildings
topic TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/3769/1/WahidOmar2002_ACriticalReviewoftheReinforced.pdf
work_keys_str_mv AT bakhterijahangir acriticalreviewofthereinforcedconcretecolumnsandwallsconcealingrainwaterpipeinmultistoreybuildings
AT omarwahid acriticalreviewofthereinforcedconcretecolumnsandwallsconcealingrainwaterpipeinmultistoreybuildings
AT makhtarahmadmahir acriticalreviewofthereinforcedconcretecolumnsandwallsconcealingrainwaterpipeinmultistoreybuildings
AT bakhterijahangir criticalreviewofthereinforcedconcretecolumnsandwallsconcealingrainwaterpipeinmultistoreybuildings
AT omarwahid criticalreviewofthereinforcedconcretecolumnsandwallsconcealingrainwaterpipeinmultistoreybuildings
AT makhtarahmadmahir criticalreviewofthereinforcedconcretecolumnsandwallsconcealingrainwaterpipeinmultistoreybuildings