Nature of delay in nominated subcontracting
Construction delay is a results of occurrence beyond the control of either the contractor or the employer. Delay can be categorized as excusable, non-excusable, compensable and concurrent. There are many causes that can contribute delay in construction. However, delay in nominated subcontracting are...
Main Author: | Nasid Masrom, Md. Asrul |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | http://eprints.utm.my/4439/1/MdAsrulNasidMFAB2007.pdf |
Similar Items
-
Nature of delay in nominated subcontracting /
by: 336736 Md. Asrul Nasid Masrom
Published: (2007) -
Nature of delay in nominated subcontracting [electronic resoruce] /
by: 336736 Md. Asrul Nasid Masrom
Published: (2007) -
Arbitration agreement in subcontract: incorporation by reference
by: Seliman, Mohamad Syahmi
Published: (2016) -
Perbandingan kepuasan penghuni terhadap penyelenggaraan fasiliti perumahan bertingkat di Pantai Dalam Kuala Lumpur
by: Zakaria, Mohamad Hibatullah, et al.
Published: (2020) -
Penyelenggaraan struktur penahan cerun rock shed: langkah mitigasi runtuhan tanah di Simpang Pulai - Blue Valley, Perak
by: Abu Bakar, Nor Athirah, et al.
Published: (2020)